|
Issue |
Title |
|
Vol 8, No 1 (2019): FEBRUARI 2019 |
PERBANDINGAN PENGARUH METODE PENEMPATAN DAMPER TERHADAP KINERJA SEISMIK STRUKTUR |
Abstract
PDF
|
Ivan Widjaja, Daniel Mulyono Kresnadi, Pamuda Pudjisuryadi, Benjamin Lumantarna |
|
Vol 8, No 1 (2019): FEBRUARI 2019 |
PERBANDINGAN PENGARUH METODE PENEMPATAN VSL GENSUI DAMPER TERHADAP KINERJA SEISMIK STRUKTUR BETON BERTULANG (GEMPA WILAYAH SURABAYA) |
Abstract
PDF
|
Giovanni Bunardi, Richard Jordan Citra, Pamuda Pudjisuryadi, Benjamin Lumantarna |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
PERBANDINGAN PERENCANAAN SAMBUNGAN KAYU DENGAN BAUT DAN PAKU BERDASARKAN PKKI 1961 NI-5 DAN SNI 7973:2013 |
Abstract
PDF
|
Eman Christianto, Budisetyono T., Ruslan Dj. |
|
Vol 8, No 2 (2019): AGUSTUS 2019 |
PERBANDINGAN PERHITUNGAN BIAYA PEKERJAAN KONSTRUKSI ANTARA SNI, HSPK KOTA SURABAYA, DAN KONTRAKTOR PADA PROYEK RUMAH TINGGAL DUA LANTAI DI SURABAYA |
Abstract
PDF
|
Josephine Gunardja, Leo Nardo Candra, Sentosa Limanto |
|
Vol 11, No 2 (2022): September 2022 |
PERBANDINGAN PERSIMPANGAN DENGAN PUTAR BALIK (U-TURN) DAN LAMPU LALU LINTAS DENGAN METODE TRADISIONAL DAN IDEAL FLOW NETWORK |
Abstract
PDF
|
Leonardus Michael Gunawan, William Natanael Hernawan, Kardi Teknomo |
|
Vol 4, No 1 (2015) |
PERBANDINGAN PPC DAN FAKTOR-FAKTOR YANG MEMPENGARUHI PADA DUA PROYEK APARTEMEN |
Abstract
PDF
|
Jonathan Jonathan, Anton Anton, Andi Andi |
|
Vol 2, No 2 (2013) |
PERBANDINGAN PRODUKTIVITAS ALAT HYDRAULIC HAMMER DAN JACK IN PILE DI SURABAYA |
Abstract
PDF
|
Risanto Tedjokusumo, Verryanto Goenawan, Paravita S. Wulandari, Jonathan Hendra Kusuma |
|
Vol 3, No 1 (2014) |
PERBANDINGAN PRODUKTIVITAS PEKERJAAN PASANGAN DINDING BATA RINGAN DAN BATA MERAH PADA PROYEK PERUMAHAN DI SURABAYA |
Abstract
PDF
|
. Evan, , Henry, Sentosa Limanto, Jonathan Hendra Kusuma |
|
Vol 3, No 1 (2014) |
PERBANDINGAN RESOURCE LEVELING DENGAN MENGGUNAKAN APLIKASI PROGRAM MICROSOFT PROJECT 2010 DAN PRIMAVERA |
Abstract
PDF
|
. Evan, , Rizky, Paulus Nugraha |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PERBANDINGAN SISTEM TUNGGAL DAN SISTEM GANDA PADA BANGUNAN TERBREIS EKSENTRIS BERBENTUK V TERBALIK DAN DIAGONAL PADA MID RISE BUILDING |
Abstract
PDF
|
Evelin Puspa Riani, Avilia Tania, Effendy Tanojo, Hasan Santoso |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PERBANDINGAN SISTEM TUNGGAL DAN SISTEM GANDA STRUKTUR BAJA RANGKA TERBREIS KONSENTRIS KHUSUS BERBENTUK V TERBALIK DENGAN DIRECT ANALYSIS METHOD |
Abstract
PDF
|
Ian Dharmawan Saputra, Louis Antonio Tjandra, Effendy Tanojo, Hasan Santoso |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
PERBANDINGAN TINGKAT KEPENTINGAN DAN KEPUASAN ANTARA INSENTIF FINANSIAL DAN INSENTIF NON-FINANSIAL BAGI STAF KARYAWAN LAPANGAN DAN KANTOR |
Abstract
PDF
|
Evan Agung Purnomo, Stefanus Anugrah P.G., Andi Andi |
|
Vol 11, No 2 (2022): September 2022 |
PERBANDINGAN UNSAFE ACT PADA JAM KERJA NORMAL DENGAN JAM KERJA LEMBUR PARA PROYEK “X” |
Abstract
PDF
|
Rexy Stevenson Wuisan, Laurensius Alexander, Andi Andi |
|
Vol 10, No 2 (2021): AGUSTUS 2021 |
PERBEDAAN DURASI PARKIR MOBIL BERDASARKAN GENDER PENGEMUDI |
Abstract
PDF
|
Javier - Christopher, Moses - Setiady, Nicolas - Amor, Jason - Sastrakusuma, Rudy - Setiawan, Bryan - Widarno |
|
Vol 4, No 1 (2015) |
PERENCANAAN DAN ESTIMASI BIAYA PELAKSANAAN UNTUK JALAN PENGHUBUNG DI KAWASAN SURABAYA TIMUR |
Abstract
PDF
|
Bryan Widarno, Irvian Dinata, Indriani Santoso, Johanes Indrojono Suwono |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
PERENCANAAN DAN EVALUASI KESELAMATAN KERJA PEKERJAAN PEMANCANGAN PADA PROYEK “X” DI SURABAYA |
Abstract
PDF
|
Billy Susilo, Jessica Adelia, Andi Andi |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
PERENCANAAN DAN PENGENDALIAN JADWAL PEKERJAAN FINISHING PROYEK RUMAH TINGGAL DENGAN METODE ACTIVITY ON NODE (AON) |
Abstract
PDF
|
Michael Lorenzo Suhartono, Danny Tejo Santosa, Ratna Setiawardani Alifen |
|
Vol 1, No 1 (2012) |
PERENCANAAN DAN PENGENDALIAN JADWAL PROYEK DENGAN MENGGUNAKAN METODE CPM PADA PROYEK APARTEMEN |
Abstract
PDF
|
Christian Kennardi, Ivan Pratama Setiadi, Andi . |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
PERENCANAAN ELEMEN STRUKTUR BAJA BERDASARKAN SNI 1729:2015 |
Abstract
PDF
|
Fendy Phiegiarto, Julio Esra Tjanniadi, Hasan Santoso, Ima Muljati |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
PERENCANAAN ELEMEN STRUKTUR BAJA CANAI DINGIN DENGAN PROGRAM EXCEL |
Abstract
PDF
|
Frans Yuridion, Putra Wibawa, Bambang Wyanto, Hasan Santoso |
|
Vol 9, No 2 (2020): AGUSTUS 2020 |
PERENCANAAN JADWAL PADA PROYEK PERUMAHAN DENGAN METODE LINE OF BALANCE |
Abstract
PDF
|
Erik - Kamitono, Vinsensius William Patrick Chandra, Ratna Setiawardani Alifen |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
PERENCANAAN SISTEM RAINWATER HARVESTING YANG BERBASIS VALUE ENGINEERING |
Abstract
PDF
|
Kwek Hartono Kurniawan, Wilbert Kosasih, Herry Pintardi Chandra, Cilcia Kusumastuti |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
PERENCANAAN STRUKTUR BAJA BERDASARKAN KEKAKUAN DAN KEKUATAN SISTEM GANDA SRPMK DAN SRBE BENTUK DIAGONAL MENURUT SNI 1726:2012 PASAL 7.2.5.1 |
Abstract
PDF
|
Hendri Sugiarto Mulia, Stefanus Edwin, Hasan Santoso, Pamuda Pudjisuryadi |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
PERENCANAAN STRUKTUR BAJA BERDASARKAN KEKAKUAN DAN KEKUATAN SISTEM GANDA SRPMK DAN SRBKK BERBENTUK MULTISTORY X MENURUT SNI 1726:2012 PASAL 7.2.5.1 |
Abstract
PDF
|
Satyakalam Arif Wicaksana, Yohanes Victor Hongkiriwang, Hasan Santoso, Pamuda Pudjisuryadi |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
PERENCANAAN STRUKTUR RANGKA ATAP BAJA CANAI DINGIN |
Abstract
PDF
|
Regyna A. D. Latumeten, Averina Aprilia A., Hasan Santoso, Ima Muljati |
|
501 - 525 of 648 Items |
<< < 16 17 18 19 20 21 22 23 24 25 > >> |