|
Issue |
Title |
|
Vol 5, No 1 (2016): FEBRUARI 2016 |
PERFORMA BANGUNAN YANG DIDESAIN MENURUT SNI 1726-2002 DAN SNI 1726-2012 PADA BANGUNAN BERATURAN 7- DAN 3-LANTAI DI WILAYAH SURABAYA PETA GEMPA INDONESIA |
Abstract
PDF
|
Karel Abraham Tantra, Zendy Sutanto, Pamuda Pudjisuryadi, Benjamin Lumantarna |
|
Vol 9, No 1 (2020): FEBRUARI 2020 |
PERFORMA DAN EFISIENSI BEBERAPA METODE PENEMPATAN VSL GENSUI DAMPER DALAM MENGURANGI INTERSTORY DRIFT DAN MEMPERBAIKI KERUSAKAN SENDI PLASTIS |
Abstract
PDF
|
Jessica Chandra Sutanto, Natasha Angelia -, Pamuda - Pudjisuryadi, Benjamin - Lumantarna |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
PERGERAKAN TANAH LATERAL AKIBAT PROSES PEMANCANGAN TIANG |
Abstract
PDF
|
Yohanes Wiraatmaja, Michael Handoko, Sugie Prawono, Gogot Setyo Budi |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
PERHITUNGAN DAN METODE KONSTRUKSI SISTEM PENDINGINAN TERHADAP AUDITORIUM |
Abstract
PDF
|
Krisanto Elim, Anthony Carissa Surja, Prasetio Sudjarwo, Nugroho Susilo |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PERHITUNGAN LIFE CYCLE COST SISTEM PENDINGIN RUANGAN PADA GEDUNG HOTEL GOLDVITEL SURABAYA |
Abstract
PDF
|
Kefin Janitra, Khrisna Widyanugrah, Ratna Setiawardani Alifen |
|
Vol 2, No 2 (2013) |
PERHITUNGAN PERCENT PLAN COMPLETED DAN IDENTIFIKASI FAKTOR TIDAK TERCAPAINYA RENCANA PEKERJAAN PADA SUATU PROYEK KONSTRUKSI |
Abstract
PDF
|
Steven ., Robby ., Andi . |
|
Vol 8, No 1 (2019): FEBRUARI 2019 |
PERHITUNGAN TEBAL LAPIS PERKERASAN JALAN PADA PROYEK X DAN ESTIMASI BIAYANYA |
Abstract
PDF
|
Arvin Briantoro, Indriani Santoso, Budiman Proboyo |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PERKUATAN TERHADAP GEMPA MENGGUNAKAN BUCKLING RESTRAINED BRACES DAN CARBON FIBER REINFORCED POLYMER JACKETING PADA BANGUNAN RUKO LIMA LANTAI TIDAK BERATURAN YANG DIDESAIN TERHADAP BEBAN GRAVITASI |
Abstract
PDF
|
Vincentius Arinata Cahaydi, Yonatan Septian Wijaya, Jimmy Chandra |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PERKUATAN UNTUK STRUKTUR YANG DIRENCANAKAN BERDASARKAN PERATURAN GEMPA TAHUN 1983 DENGAN MENGGUNAKAN VSL GENSUI DAMPER: STUDI KASUS STRUKTUR GEDUNG T UNIVERSITAS KRISTEN PETRA |
Abstract
PDF
|
Ferlinda Hermawan Tjhai, Teddy Tirta Gunawan, Benjamin Lumantarna, Pamuda Pudjisuryadi |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
PERMASALAHAN KONTRAK LUMP-SUM PADA PROYEK-PROYEK KONSTRUKSI DI SURABAYA |
Abstract
PDF
|
Steven Wijaya, Denny Pranajaya, Andi Andi |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PERMODELAN GESER DINDING GESER BETON UNTUK ANALISIS NON-LINIER |
Abstract
PDF
|
Tifani Tifani, Kevin Effendy, Jimmy Chandra, Joko Purnomo |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PERMODELAN LENTUR DINDING BETON UNTUK ANALISIS NON-LINIER |
Abstract
PDF
|
Kevin Cornelius Gondomartono, Sunardi Widjaja, Jimmy Chandra, Joko Purnomo |
|
Vol 3, No 2 (2014) |
PERSEPSI PEKERJA TERHADAP SISTEM MANAJEMEN KESELAMATAN PADA PROYEK KONSTRUKSI DI SURABAYA |
Abstract
PDF
|
Yohana Eko, Andrean Prasetya Wijaya, Andi . |
|
Vol 3, No 1 (2014) |
PERTIMBANGAN PENGGUNAAN FREEWARE SEBAGAI ALTERNATIF DALAM PENJADWALAN PROYEK |
Abstract
PDF
|
Yohana Gunawan Henuk, Vanessa Paramitha Teguh, Paulus Nugraha, Sandra Lukito |
|
Vol 4, No 1 (2015) |
PERUBAHAN KEKUATAN GESER TANAH LEMPUNG JENUH AKIBAT PEMANCANGAN |
Abstract
PDF
|
Ligis Ebel Meinata, Andrew Setiawan, Gogot Setyo Budi |
|
Vol 10, No 1 (2021): FEBRUARI 2021 |
POTRET INDUSTRI KONSTRUKSI DI SURABAYA DALAM MASA PANDEMI COVID-19 |
Abstract
PDF
|
Kevin Jonathan Santoso, Kevin Arianto Wijaya, Herry Pintardi Chandra, Soehendro - Ratnawidjaja |
|
Vol 4, No 1 (2015) |
PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN GALIAN GEDUNG P1 P2 UK PETRA |
Abstract
PDF
|
Kelvin Rudy Sutanto, Michael Halmar Kosasi, Andi Andi |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
PRODUKTIVITAS DAN KETERLAMBATAN PRODUKSI TIANG PANCANG DAN TIANG LISTRIK PADA PERUSAHAAN “X” DENGAN MPDM |
Abstract
PDF
|
Alvin J.L., Leonard F.A., Sentosa Limanto, Jonathan Hendra Kusuma |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
PRODUKTIVITAS PEKERJA PADA PEKERJAAN BETON BERTULANG PROYEK BANGUNAN BERTINGKAT (Studi Kasus Proyek Bangunan Condominium TP6) |
Abstract
PDF
|
Fransisco Ardi, Kefin C. Wanandy, Ratna S. Alifen |
|
Vol 10, No 2 (2021): AGUSTUS 2021 |
PROGRAM ANALISIS EKONOMIS BERDASARKAN BIAYA ALAT UNTUK MENENTUKAN UMUR EKONOMIS ALAT DENGAN MEMBANDINGKAN BIAYA EXCAVATOR ANTARA RENCANA VS AKTUAL |
Abstract
PDF
|
Anthony - Alexander, James Christopher Willianto, Ratna - Alifen |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
PROGRAM DESAIN PERKUATAN KOLOM DENGAN MENGGUNAKAN FRP CONFINEMENT SESUAI ACI 440.2R-17 |
Abstract
PDF
|
Rikson Kurniawan Tandelilin, Steven Sanjaya, Pamuda Pudjisuryadi, Gunawan Budi Wijaya |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
PROGRAM OPTIMASI JUMLAH BACKHOE-DUMP TRUCK DALAM OPERASI PENGGALIAN TANAH MEKANIS |
Abstract
PDF
|
Randy Artana Gunawan, Alvin Gunawan, Ratna Setiawardani Alifen |
|
Vol 2, No 2 (2013) |
PROGRAM PERHITUNGAN EFEKTIVITAS WAKTU DAN BIAYA PEMAKAIAN TOWER CRANE |
Abstract
PDF
|
Paulus Eric Hartono, Noviyanti ., Ratna S. Alifen |
|
Vol 12, No 1 (2023): MARET 2023 |
PROGRAM PERHITUNGAN WAKTU SIKLUS PENGOPERASIAN BERDASARKAN KOORDINAT PENEMPATAN TOWER CRANE |
Abstract
PDF
|
Lucky Wijaya, Nicholas Bernard, Ratna S. Alifen |
|
Vol 5, No 1 (2016): FEBRUARI 2016 |
PROPORSI BIAYA TIAP SATUAN PEKERJAAN STRUKTUR BETON BERTULANG PROYEK KONSTRUKSI BANGUNAN TINGGI |
Abstract
PDF
|
Jeremy August Tambayong, Budiman Proboyo, Indriani Santoso |
|
526 - 550 of 648 Items |
<< < 17 18 19 20 21 22 23 24 25 26 > >> |