PERBANDINGAN RESOURCE LEVELING DENGAN MENGGUNAKAN APLIKASI PROGRAM MICROSOFT PROJECT 2010 DAN PRIMAVERA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Brucker, P. (1998). Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods. ELSEVIER: European Journal of Operational Research, 112, 3-41
Harris, Paul E. (2010). Calculation Differences when Importing from Microsoft Project 2003-2010 Into Oracle Primavera P6 Version 7. Eastwood Harris Pty Ltd. Melbourne.
Hegazy, Tarek.(1999). Optimization of Resource Allocation And Leveling Using Genetic Algorithms. Journal of Construction Engineering and Management, 108.
Hermawan, Aris.(2006).Penggunaan Perangkat Lunak dalam Pengelolaan Proyek Konstruksi.Jurnal Teknik Sipil Fakultas Teknik Unika Soegijapranata, volume III, No. 1, 1-7.
Hinze, W Jimmie.(2012). Construction Planning and Scheduling 4th edition. New Jersey.
K.Icha.,& Elliot C.T.(2012). Perbandingan Aplikasi Program Microsoft Project dan Primavera dalam Penjadwalan Proyek Konstruksi. Student Journal-Petra Christian University.
Kastor, A., & K.Sirlakouis.(2008). The Effectiveness of Resource Levelling Tools for Resource Constraints Project Scheduling Problem. International Journal of Project Management, Page1.
Raja,K. & S.Kumanan.2007.Resource Leveling Using Petrinet and Memetic Approach. AM. J. Applied Sci., 4: 317-322
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :