PERENCANAAN DAN PENGENDALIAN JADWAL PEKERJAAN FINISHING PROYEK RUMAH TINGGAL DENGAN METODE ACTIVITY ON NODE (AON)
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Alifen, R. S., Setiawan, R. S., dan Sunarto, A. (2000). “Analisa “What If” Sebagai Metode Antisipasi Keterlambatan Durasi Proyek.” Dimensi Teknik Sipil. Vol. 2, No. 1, 103-113.
Building and Construction Authority. (2005). Conquas 21 : The BCA Construction Quality Assessment System (6th ed.), Author, Singapore.
Gould, Frederick E. (2002). Managing The Construction Process: Estimating, Sceduling, and Project Control (2nd ed.), Roger Williams University, USA.
Hamilton, Albert. (1997). Management by Project, Thomas Telford Services Ltd, London.
Indonesia. Kementrian Pekerjaan Umum. (2013). Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum, Peraturan Menteri Pekerjaan Umum No. 11/PRT/M/2013, Author, Jakarta. Means, R.S. (2014). Building Construction Cost Data (72nd ed.). R.S. Means Company, Inc., Kingston, MA.
O’Brien, J. J., Zilly, R. G. (1971). Contractor’s Management Handbook, McGraw-Hill, New York.
Proboyo, Budiman. (1999). “Keterlambatan Waktu Pelaksanaan Proyek : Klasifikasi dan Peringkat dari Penyebab-penyebabnya.” Dimensi Teknik Sipil. Vol. 1, No. 1, 49-58.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :