Author Details
Limanto, Sentosa, Dosen Program Studi Teknik Sipil Universitas Kristen Petra, Indonesia
-
Vol 2, No 2 (2013) - Articles
STUDI KASUS PENJADWALAN PROYEK PADA PROYEK RUMAH TOKO X MENGGUNAKAN MICROSOFT PROJECT 2010
Abstract
PDF
-
Vol 4, No 2 (2015): AGUSTUS 2015 - Articles
EVALUASI BERBAGAI MACAM MATERIAL TAHAN API DALAM GEDUNG BERDASARKAN KLARIFIKASI STANDAR NASIONAL INDONESIA
Abstract
PDF
-
Vol 5, No 1 (2016): FEBRUARI 2016 - Articles
EVALUASI PRODUKTIVITAS KERJA STRUKTUR KOLOM, BALOK, DAN PLAT DI PROYEK TUNJUNGAN PLAZA 6
Abstract
PDF
-
Vol 5, No 2 (2016): AGUSTUS 2016 - Articles
PRODUKTIVITAS DAN KETERLAMBATAN PRODUKSI TIANG PANCANG DAN TIANG LISTRIK PADA PERUSAHAAN “X” DENGAN MPDM
Abstract
PDF
-
Vol 7, No 2 (2018): AGUSTUS 2018 - Articles
ANALISA PRODUKTIVITAS PEKERJA DENGAN METODE WORK SAMPLING: STUDI KASUS PADA PROYEK X
Abstract
PDF
-
Vol 8, No 1 (2019): FEBRUARI 2019 - Articles
ANALISIS PENYEBAB DAN PERBANDINGAN FAKTOR-FAKTOR COST OVERRUNS TERHADAP HIGH RISE BUILDING DAN LOW RISE BUILDING DI SURABAYA
Abstract
PDF
-
Vol 8, No 1 (2019): FEBRUARI 2019 - Articles
TINGKAT KEPATUHAN PERATURAN KESELAMATAN KESEHATAN KERJA LINGKUNGAN PADA PENGGUNAAN ALAT PEMANCANG & BORE PILE
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
ANALISA PRODUKTIVITAS PEKERJAAN ERECTION RANGKA PORTAL BAJA UNTUK BANGUNAN GUDANG “X” DI SIDOARJO
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
ANALISA BIAYA PROYEK RUMAH TINGGAL DUA LANTAI DI SURABAYA TIMUR
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
PERBANDINGAN PERHITUNGAN BIAYA PEKERJAAN KONSTRUKSI ANTARA SNI, HSPK KOTA SURABAYA, DAN KONTRAKTOR PADA PROYEK RUMAH TINGGAL DUA LANTAI DI SURABAYA
Abstract
PDF
-
Vol 11, No 1 (2022): Februari 2022 - Articles
FAKTOR-FAKTOR MOTIVASI PEKERJA PADA USAHA JASA KONSTRUKSI BERDASARKAN TEORI HERZBERG
Abstract
PDF
-
Vol 11, No 1 (2022): Februari 2022 - Articles
EVALUASI KINERJA PROYEK DENGAN METODE EARNED VALUE PADA PENINGKATAN JALAN DI KABUPATEN SUMENEP
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
ANALISA DURASI WAKTU PELAKSANAAN PROYEK DI RUMAH SAKIT ROYAL DAN PROYEK X DENGAN METODE EARNED SHCEDULE
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
FAKTOR PENYEBAB DAN DAMPAK CHANGE ORDER TERHADAP INDIKATOR PERFORMA PROYEK
Abstract
PDF
-
Vol 12, No 1 (2023): MARET 2023 - Articles
ANALISIS PENGARUH SHIFT KERJA TERHADAP BEBAN KERJA MENTAL PEKERJA PADA PROYEK “X” DENGAN METODE SUBJECTIVE WORKLOAD ASSESSMENT TECHNIQUE
Abstract
PDF
-
Vol 12, No 1 (2023): MARET 2023 - Articles
FAKTOR PENYEBAB DAN DAMPAK KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI MENURUT KONTRAKTOR TERHADAP INDIKATOR PERFORMA PROYEK
Abstract
PDF
-
Vol 12, No 1 (2023): MARET 2023 - Articles
ANALISIS PENYEBAB, DAMPAK, DAN ANTISIPASINYA TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA
Abstract
PDF