ANALISIS PENYEBAB, DAMPAK, DAN ANTISIPASINYA TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Al Maktoumi, I.S., Khan, F.R., and Al Maktoumi. Al Maktoumi, A.R.S. (2020). “Assessing The Factors Causing Project Completion Delays In The Construction Sector Of Oman Using SEM-PLS.” Humanities & Social Sciences Reviews I, Vol. 9, No. 3, 900-912.
Choudhry, R., Nasir, A., and Gabriel, H. (2012). “Cost and Time Overruns in Highway Projects in Pakistan.” Centenary Celebration (1912-2012), Proceedings of Pakistan Engineering Congress, Lahore, Pakistan, December, 353-370.
Ervianto, W. (2005). Manajemen Proyek Konstruksi (Edisi Revisi), Andi, Yogyakarta.
Ibironke, and Timothy, O. (2012). “Impact of Non-Implementation of Time, Cost, and Quality Management Procedures in The Nigerian Construction Industry.” Journal of Building Performance, Vol. 3, No. 1, 9-13.
Ismail, I., Rahman, I. A., and Memon, A. H. (2013). “Study of Factors Causing Time and Cost Overrun Throughout Life Cycle of Construction Project.” Proceedings of Malaysian Technical Universities Conference on Engineering & Technology (MUCET), Kuantan, Pahang, Malaysia, December 3 – December 4.
Levis and Artherley (1996). Delay Construction, Cahner Books International, Langford.
Memon A.H., Rahman, I.A., and Aziz, A.A.A. (2012)., “The Cause Factors of Large Project’s Cost Overrun : A Survey in the Southern Part of Peninsular Malaysia.” International Journal of Real Estate Studies. Vol. 7, No. 2, 1-10.
Tshering, Y., Wangmo, S., and Choden, Z. (2020)., “Factor Affecting Time Overrun in Construction Project in Bhutan.” Journal of Education & Practice. Vol. 11, No. 29, 1-7.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :