ANALISA DURASI WAKTU PELAKSANAAN PROYEK DI RUMAH SAKIT ROYAL DAN PROYEK X DENGAN METODE EARNED SHCEDULE
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Lipke, W. (2014). “Introduction to Earned Schedule.” PM World Journal. Vol. 3, 1–11.
Lipke, W., Zwikael, O., Henderson, K., and Anbari, F. (2009). “Prediction of Project Outcome.” International Journal of Project Management. Vol.27, 400–407.
Proboyo, B. (1999). “Keterlambatan Waktu Pelaksanaan Proyek : Klasifikasi Dan Peringkat Dari Penyebab-Penyebabnya (Project Implementation Delay : Causes Classification and Ratings).” Dimensi Teknik Sipil. Vol.1, 49–58.
Vanhoucke, M., Vandevoorde, S. (2007). “A Simulation and Evaluation of Earned Value Metrics to Forecast the Project Duration.” Journal of the Operational Research Society. Vol. 58, 1361–1374.
Vanhoucke, M., Andrade, A., Salvaterra, F., and Batselier, J. (2015). “Introduction to Earned Duration.” The Quartely Magazine of the College of Performance Management. Vol. 2, 15–27.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :