|
Issue |
Title |
|
Vol 10, No 2 (2021): AGUSTUS 2021 |
ANALISIS PRODUKTIVITAS TENAGA KERJA: STUDI KASUS PROYEK PERUMAHAN X DI KOTA MEDAN |
Abstract
PDF
|
Tommy - Brilliant, Vicky - Asnawi, Sentosa - Limanto |
|
Vol 8, No 1 (2019): FEBRUARI 2019 |
ANALISIS SISA MATERIAL KONSTRUKSI AKIBAT REWORK PADA PEKERJAAN FINISHING PROYEK RUMAH TINGGAL |
Abstract
PDF
|
Albert Yanuar Ivan Wongso, Yoga Ditia Widjaya, Ratna S. Alifen |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
ANALISIS TANTANGAN DAN MANFAAT BANGUNAN HIJAU |
Abstract
PDF
|
Gregorius Kevin, Iwan Anggalimanto, Herry P. Chandra, Soehendro Ratnawidjaja |
|
Vol 5, No 1 (2016): FEBRUARI 2016 |
ANALISIS WAKTU PEKERJAAN FINISHING PADA PROYEK APARTEMEN |
Abstract
PDF
|
Albert Kent, Richard Phieter Phie, Sentosa Limanto, Jonathan Hendra Kusuma |
|
Vol 11, No 2 (2022): September 2022 |
ANTISIPASI KETERLAMBATAN PROYEK DENGAN METODE PENJADWALAN CPM |
Abstract
PDF
|
Christian Wijaya, Lionel Goldie Song, Ratna Setiawardani Alifen |
|
Vol 10, No 2 (2021): AGUSTUS 2021 |
APLIKASI ASPAL EMULSI DAN FLY ASH PADA TANAH EKSPANSIF |
Abstract
PDF
|
Daniel - Lewa, Reynaldi - Sedjie, Daniel - Tjandra, Johanes - Suwono |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
APLIKASI PERHITUNGAN ALINYEMEN HORISONTAL DAN ALINYEMEN VERTIKAL |
Abstract
PDF
|
Michael Antonie Prayogo, Rudy Setiawan |
|
Vol 8, No 2 (2019): AGUSTUS 2019 |
APLIKASI PERHITUNGAN ALINYEMEN HORISONTAL DAN VERTIKAL DENGAN MICROSOFT EXCEL |
Abstract
PDF
|
Christian Ferdinan Sanjaya, Andreas Pramono Setiawan, Rudy Setiawan, Tirsa Endeli Tumbelaka |
|
Vol 8, No 2 (2019): AGUSTUS 2019 |
APLIKASI PERHITUNGAN ALINYEMEN HORISONTAL DAN VERTIKAL DENGAN MICROSOFT EXCEL |
Abstract
PDF
|
Christian Ferdinan Sanjaya, Andreas Pramono Setiawan, Rudy Setiawan, Tirsa Endeli Tumbelaka |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
APPROXIMATE COST ESTIMATE BERDASARKAN KANDUNGAN BESI DAN KEBUTUHAN BEKISTING PADA STRUKTUR BETON BERTULANG BANGUNAN RUKO (SOHO) |
Abstract
PDF
|
Patricia Adriani Kwandou, Iswandi Yoseph, Indriani Santoso, Budiman Proboyo |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
APPROXIMATE COST ESTIMATE BERDASARKAN KANDUNGAN BESI DAN KEBUTUHAN BEKISTING PADA STRUKTUR BETON BERTULANG BANGUNAN TINGGI |
Abstract
PDF
|
Hendra Kwandoko, Chaisen Nawir, Budiman Proboyo, Indriani Santoso |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
APPROXIMATE COST ESTIMATE BERDASARKAN PEMAKAIAN BAHAN BAJA DAN CAT PADA BANGUNAN STRUKTUR BAJA |
Abstract
PDF
|
Dhendy P. Santoso, V.D.C. Watulangkow, Budiman Proboyo, Indriani Santoso |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
ASPEK-ASPEK YANG MENDUKUNG PENINGKATAN KINERJA TUKANG DALAM PROYEK KONSTRUKSI DI SURAB |
Abstract
PDF
|
Monica Beatrick Wineke, Vela Rismila, Paulus Nugraha, Tirsa Endeli Tumbelaka |
|
Vol 10, No 1 (2021): FEBRUARI 2021 |
ASSESSMENT DAN PERKUATAN STRUKTUR PADA BANGUNAN INDUSTRI 7 LANTAI |
Abstract
PDF
|
Celine Michaella Sutjiadi, Tika - Harsono, Daniel - Tjandra, Handoko - Sugiharto |
|
Vol 2, No 2 (2013) |
BATAKO BERLUBANG GEOPOLIMER BERBAHAN DASAR LUMPUR SIDOARJO |
Abstract
PDF
|
Edwin Valentino, David Christianto, Djwantoro Hardjito, Antoni . |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
BERBAGAI FAKTOR YANG MEMENGARUHI SIKAP MAHASISWA PENGGUNA MOBIL YANG BERNIAT BERKENDARA BERSAMA KE KAMPUS |
Abstract
PDF
|
Melia Agustine Lukito, Devika Reski Pebrianty, Rudy Setiawan |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
BETON RENDAH SEMEN DENGAN KONSEP KEPADATAN PARTIKEL |
Abstract
PDF
|
Erianto Hardi, Ricky Darius Tandean, Antoni Antoni |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
BIAYA SISTEM KONSERVASI AIR EXISTING DAN USULAN PADA APARTEMEN AMEGA CROWN RESIDENCES SURABAYA |
Abstract
PDF
|
Yudi Sanjaya, Jeffry Gunawan, Herry Pintardi Chandra, Cilcia Kusumastuti |
|
Vol 8, No 2 (2019): AGUSTUS 2019 |
CAMPURAN OPTIMUM TANAH KAPUR WASAY DENGAN SEMEN UNTUK LAPIS FONDASI JALAN |
Abstract
PDF
|
Edriant Yobel Edong Rumissing, Cherly Agnes Pattiasina, Paravita Sri Wulandari, Harry Patmadjaja |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
CAMPURAN SLURRY LEMPUNG SETEMPAT SEBAGAI PENGGANTI BENTONITE |
Abstract
PDF
|
Grant Rich, Rinaldi The, Johanes Indrojono Suwono |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
CAMPURAN TANAH LEMPUNG DAN FLY-ASH SEBAGAI PENGGANTI BENTONITE UNTUK INSTRUMENTASI TANAH |
Abstract
PDF
|
James Fransisco Tandiary, David Halim, Johanes I. Suwono |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
CARA PENDEKATAN PERHITUNGAN KUANTITAS PEMBESIAN PADA BALOK STRUKTUR BETON BERTULANG |
Abstract
PDF
|
Michael Danielle, Sugiarto Candra, Budiman Proboyo, Indriani Santoso |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
CARA PENDEKATAN PERHITUNGAN KUANTITAS PEMBESIAN PADA KOLOM STRUKTUR BETON BERTULANG |
Abstract
PDF
|
David Christiando Angir, Daniel Erwin Ekajaya, Indriani Santoso, Budiman Proboyo |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
CARA PENDEKATAN PERHITUNGAN KUANTITAS PEMBESIAN PADA KOLOM STRUKTUR BETON BERTULANG |
Abstract
PDF
|
Ivana Tanjung, Ronald Aristotelin, Budiman Proboyo, Indriani Santoso |
|
Vol 7, No 1 (2018): FEBRUARI 2018 |
CARA PENDEKATAN PERHITUNGAN KUANTITAS PEMBESIAN PADA PELAT LANTAI STRUKTUR BETON BERTULANG (STUDI KASUS RUKO 4 LANTAI DI SURABAYA) |
Abstract
PDF
|
Andre Jayanata, Wilson Linardo, Indriani Santoso, Budiman Proboyo |
|
101 - 125 of 648 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |