|
Issue |
Title |
|
Vol 8, No 1 (2019): FEBRUARI 2019 |
KRITERIA GREEN ROAD CONSTRUCTION DARI SUDUT PANDANG KONTRAKTOR DAN DINAS PEKERJAAN UMUM DI SURABAYA |
Abstract
PDF
|
Theodorus Rudi Chandra, Ray Allchin Dwiputra Komala, Herry Pintardi Chandra, Soehendro Ratnawidjaja |
|
Vol 1, No 1 (2012) |
KRITISI DESAIN PSEUDO ELASTIS PADA BANGUNAN BERATURAN 6- DAN 10-LANTAI DENGAN DENAH PERSEGI PANJANG DI WILAYAH 6 PETA GEMPA INDONESIA |
Abstract
PDF
|
Jimmy Setiawan, Victor Kopaloma, Benjamin Lumantarna |
|
Vol 2, No 1 (2013) |
KRITISI DESAIN PSEUDO ELASTIS PADA BANGUNAN BERATURAN 6- DAN 10- LANTAI DENGAN DENAH PERSEGI DI WILAYAH 6 PETA GEMPA INDONESIA |
Abstract
PDF
|
Go Aei Li, Sherly Sulistio, Ima Muljati G., Benjamin Lumantarna |
|
Vol 1, No 1 (2012) |
KRITISI DESAIN PSEUDO ELASTIS PADA BANGUNAN BERATURAN 6- DAN 10-LANTAI DENGAN DENAH PERSEGI DI WILAYAH 2 PETA GEMPA INDONESIA |
Abstract
PDF
|
Yosepha Puteri T., Yulietta D. W., Ima Muljati G., Benjamin Lumantarna |
|
Vol 1, No 1 (2012) |
KRITISI DESAIN PSEUDO ELASTIS PADA BANGUNAN BERATURAN 6- DAN 10-LANTAI DENGAN DENAH PERSEGI PANJANG DI WILAYAH 2 PETA GEMPA INDONESIA |
Abstract
PDF
|
Fransisca Wijaya, Liske Widjojo, Ima Muljati, Benjamin Lumantarna |
|
Vol 2, No 2 (2013) |
MACAM – MACAM EPOXY DAN POLYURETHANE BASED FLOORING SYSTEM BESERTA KINERJANYA |
Abstract
PDF
|
Brian Christopher Sutandyo, Evan Sutantu Putra, P. Sudjarwo, Januar B. |
|
Vol 2, No 2 (2013) |
MACAM-MACAM FLOOR HARDENER DENGAN KINERJANYA |
Abstract
PDF
|
Leonardo Krisnanto Wijono, Gerry Febrian Ongko, Prasetio Sudjarwo, Januar Buntoro |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
MANAJEMEN KETERSEDIAAN DAN KEBUTUHAN PARKIR MOBIL DI UNIVERSITAS KRISTEN PETRA |
Abstract
PDF
|
Angeline Angeline, Indira Detari Solli, Rudy Setiawan |
|
Vol 8, No 1 (2019): FEBRUARI 2019 |
MANAJEMEN LALULINTAS DAERAH SEKITAR UNIVERSITAS KRISTEN PETRA |
Abstract
PDF
|
Trimardiyanto Pamuji, Firman Samparaya, Rudy Setiawan |
|
Vol 8, No 2 (2019): AGUSTUS 2019 |
Manajemen Risiko Proyek Konstruksi Perbaikan Dermaga di Kota Gresik |
Abstract
PDF
|
Evander Setiawan Utomo, Raphael Ricardo Putradi, Herry Pintardi Chandra, Cilcia Kusumastuti |
|
Vol 1, No 1 (2012) |
MATERIAL PEREDAM SUARA DENGAN MENGGUNAKAN KOMBINASI DAMEN, SERABUT KELAPA, DAN DINDING BATA |
Abstract
PDF
|
Febrian Tri SH, Denny Sugiarto S, Prasetio Sudjarwo, Januar Buntoro |
|
Vol 8, No 1 (2019): FEBRUARI 2019 |
METODE KANTILEVER PELAKSANAAN JEMBATAN RANGKA BAJA SEI PUTING BENTANG 60 M |
Abstract
PDF
|
Matthew Gunawan, Rafael Reinaldo Lorens, Gunawan Budi Wijaya, Handoko Sugiharto |
|
Vol 3, No 2 (2014) |
MODEL FAKTOR PENYEBAB RISIKO TERHADAP KEBERHASILAN PROYEK KONSTRUKSI |
Abstract
PDF
|
Priscillia Syaranamual, Patrick Tandean, Herry P. Chandra |
|
Vol 3, No 1 (2014) |
MODEL FAKTOR-FAKTOR PENYEBAB DAN DAMPAK KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA |
Abstract
PDF
|
. Desyllia, Fibbie Chendra, Herry Pintardi Chandra |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
MODEL GAYA KEPEMIMPINAN YANG MEMPENGARUHI KINERJA BAWAHAN |
Abstract
PDF
|
Antoni Tanujaya, Tan Ollysia Tansil, Herry Pintardi Chandra |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
MODEL PEMILIHAN MODA ANTARA KENDARAAN PRIBADI DAN BUS KAMPUS |
Abstract
PDF
|
Ronny Esha, Reza Aipassa, Rudy Setiawan |
|
Vol 11, No 2 (2022): September 2022 |
MODEL PEMILIHAN PROJECT DELIVERY METHODS DENGAN ANALYTICAL HIERARCHY PROCESS |
Abstract
PDF
|
Stephanus Eduard Sugianto, Yosep Setiadi Lukas, Andi Andi |
|
Vol 3, No 2 (2014) |
MODEL PENGUKURAN TINGKAT KESELAMATAN KERJA PENGGUNAAN TOWER CRANE |
Abstract
PDF
|
Michelle Kwan, Irvan Anggrawan, Ratna Setiawardani Alifen |
|
Vol 2, No 2 (2013) |
MODEL PENGUKURAN TINGKAT MOTIVASI DAN DEMOTIVASI PEKERJA PROYEK KONSTRUKSI DI SURABAYA |
Abstract
PDF
|
William Denyro Kohar, Sylvie Amelina, Andi . |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
MODEL PENILAIAN KEPEMIMPINAN MANAJER PROYEK YANG DIHARAPKAN BAWAHAN BERDASARKAN KRITERIA PERILAKU KEPEMIMPINAN |
Abstract
PDF
|
Bobby Yerikho, Felix Sanjaya, Andi Andi |
|
Vol 5, No 2 (2016): AGUSTUS 2016 |
MODEL STUDI KELAYAKAN INVESTASI PROYEK PERUMAHAN SEDERHANA |
Abstract
PDF
|
Bernard Julius Seto, Danny Sungko, Ratna Setiawardani Alifen |
|
Vol 6, No 1 (2017): FEBRUARI 2017 |
MODIFIKASI TEKNIK DISCRETE SHEAR GAP PADA ELEMEN BALOK TIMOSHENKO BERBASIS KRIGING |
Abstract
PDF
|
Stevanus Wongso Santoso, Mellyssa Sutrisno, Wong Foek Tjong |
|
Vol 6, No 1 (2017): FEBRUARI 2017 |
MONITORING JADWAL SUATU PROYEK SEKOLAH DENGAN MENGGUNAKAN METODE SPI DAN PPC |
Abstract
PDF
|
Vincent Sukiman, Yohanes Yan, Andi Andi |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
MONITORING PENJADWALAN PROYEK & EVALUASI JUMLAH TOWER CRANE PADA PROYEK CONDOMINIUM & PODIUM SEBUAH PLAZA DI TENGAH KOTA |
Abstract
PDF
|
Agnes Maria Wijaya, Ayu Wirastuti, Paulus Nugraha, Sandra Loekita |
|
Vol 10, No 1 (2021): FEBRUARI 2021 |
MOTIVASI PEKERJA KONSTRUKSI DALAM MASA PANDEMI COVID-19 DI SURABAYA |
Abstract
PDF
|
Jovan Adriel Alim, Bryant Hebert Ongkojoyo, Herry Pintardi Chandra |
|
251 - 275 of 648 Items |
<< < 6 7 8 9 10 11 12 13 14 15 > >> |