MODEL FAKTOR-FAKTOR PENYEBAB DAN DAMPAK KETERLAMBATAN PROYEK KONSTRUKSI DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Abedi, Fathi & Mohammad. (2011). Major Causes of Construction Delays under Client Category and Contractor Category. The First Iranian Students Scientific Conference in Malaysia, 9 & 10 Apr 2011, UPM, Malaysia.
Ali, Smith, Pitt and Choon. (2012). Contractors’ Perception of Factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia.
Assaf and Al-Hejji. (2006). Causes of Delay in Large Construction Projects. International Journal of Project Management, Vol. 24, p.349–357.
Chan, Daniel W. dan Kumaraswamu, Mohan M. (1997). A Comparative Study of Causes of Time Overruns in Hong Kong Construction Projects. International Journal of Project Management, Vol.15(1), p 55-63.
El-Razek, Bassioni, and Mobarak. (2008). Journal of Construction Engineering and Management, Vol.134, p.831-841.
Haseeb, Lu, Bibi, Dyian and Rabbani. (2011). Problems of Projects and Effects of Delays in the Construction Industry of Pakistan. Australian Journal of Business and Management Research, Vol.1, No.5, p.41-50.
Faridi A.S. and El-Sayegh, S.M. (2006). Significant Factors Causing Delay in The UAE Construction Industry. Construction Management and Economics, Vol. 24, p. 1167–1176.
Toor, Shamas-Ur-Rehman., & Ogunlana, O. Stephen. (2008). Problem Causing Delays in Major Construction Projects in Thailand. Construction Management and Economics, Vol. 26., p. 395-408.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :