Author Details
Alifen, Ratna Setiawardani, Dosen Program Studi Teknik Sipil Universitas Kristen Petra, Indonesia
-
Vol 2, No 2 (2013) - Articles
PERBANDINGAN KOMPOSISI PEKERJA PASANGAN DINDING BATA ANTARA SNI 2008 DENGAN KENYATAAN DI LAPANGAN PADA PROYEK PERUMAHAN
Abstract
PDF
-
Vol 3, No 2 (2014) - Articles
MODEL PENGUKURAN TINGKAT KESELAMATAN KERJA PENGGUNAAN TOWER CRANE
Abstract
PDF
-
Vol 5, No 2 (2016): AGUSTUS 2016 - Articles
MODEL STUDI KELAYAKAN INVESTASI PROYEK PERUMAHAN SEDERHANA
Abstract
PDF
-
Vol 5, No 2 (2016): AGUSTUS 2016 - Articles
PENILAIAN INDIKATOR K3L PADA PENGGUNAAN TOWER CRANE
Abstract
PDF
-
Vol 6, No 2 (2017): AGUSTUS 2017 - Articles
STUDI PENERAPAN MANAJEMEN RANTAI PASOK PENGADAAN MATERIAL PROYEK KONSTRUKSI
Abstract
PDF
-
Vol 7, No 2 (2018): AGUSTUS 2018 - Articles
KECELAKAAN, KESELAMATAN, KESEHATAN, DAN LINGKUNGAN KERJA PADA PEKERJAAN GALIAN TANAH BASEMENT
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
ANALISIS PENJADWALAN PROYEK PERKANTORAN
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
ANALISIS LABOR UTILIZATION RATE PADA JAM KERJA NORMAL DAN JAM KERJA LEMBUR
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
KONSEP SUSTAINABLE CONSTRUCTION PADA RUMAH SEDERHANA DITINJAU DARI PENGGUNAAN MATERIAL DALAM PROSES PELAKSANAAN
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
IMPLEMENTASI DAN FAKTOR HAMBATAN DESIGN FOR CONSTRUCTION SAFETY (DfCS)
Abstract
PDF
-
Vol 9, No 1 (2020): FEBRUARI 2020 - Articles
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS PROYEK KONSTRUKSI
Abstract
PDF
-
Vol 9, No 1 (2020): FEBRUARI 2020 - Articles
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS PROYEK KONSTRUKSI
Abstract
PDF
-
Vol 9, No 1 (2020): FEBRUARI 2020 - Articles
ANALISIS OPERASIONAL PEMANCANGAN JACK-IN PILE DENGAN MODEL SIMULASI CYCLONE
Abstract
PDF
-
Vol 9, No 2 (2020): AGUSTUS 2020 - Articles
ANALISA SISA MATERIAL PADA PEKERJAAN STRUKTUR KONSTRUKSI BETON BERTULANG
Abstract
PDF
-
Vol 9, No 2 (2020): AGUSTUS 2020 - Articles
PERENCANAAN JADWAL PADA PROYEK PERUMAHAN DENGAN METODE LINE OF BALANCE
Abstract
PDF
-
Vol 9, No 2 (2020): AGUSTUS 2020 - Articles
SIMULASI OPERASI KONSTRUKSI FLEXIBLE PAVEMENT DENGAN MODEL CYCLONE STUDI KASUS : PROYEK JALAN KOTA DI TARAKAN
Abstract
PDF
-
Vol 11, No 1 (2022): Februari 2022 - Articles
FAKTOR-FAKTOR YANG MEMPENGARUHI PERFORMA PROYEK KONSTRUKSI DI MASA PANDEMI
Abstract
PDF
-
Vol 11, No 1 (2022): Februari 2022 - Articles
EFEKTIVITAS PENGGUNAAN TOWER CRANE BERDASARKAN PENJADWALAN PADA PROYEK BANGUNAN PASAR BESAR SULTAN AGUNG KOTA NGAWI
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
PANDUAN PENGGUNAAN EKSKAVATOR BERDASARKAN PERATURAN K3 DAN PENGALAMAN KECELAKAAN KERJA DI PROYEK
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
ANTISIPASI KETERLAMBATAN PROYEK DENGAN METODE PENJADWALAN CPM
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
ANALISIS MANAJEMEN RISIKO KERUSAKAN BANGUNAN GEDUNG APARTEMEN PADA MASA OPERASIONAL BANGUNAN
Abstract
PDF