PENGUKURAN PRODUKTIVITAS DAN FAKTOR-FAKTOR YANG MEMENGARUHI PEKERJAAN KONSTRUKSI DENGAN METODE HALF-SLAB (STUDI KASUS PADA APARTEMEN “X” DI SURABAYA)
(1) Mahasiswa Program Studi Teknik Sipil, Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil, Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil, Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Oglesby, C.H., Parker, H.W., and Howell, G.A. (1989). Productivity Improvement in Construction, McGraw-Hill Book Company, New York.
Thomas, H.R. (2000). Principles of Construction Labor Productivity Measurement and Processing: Final Report, Pennsylvania Transportation Institute Pennsylvania State University, Pennysylvania.
Thomas, H.R., Riley, D.R., and Savindo, V.E. (1999). “Loss of Labor Productivity Due to Delivery Methods and Weather.” Journal of Construction Engineering and Management, 125(1), 39-46.
Thomas, H.R., and Savindo, V.E. (2000). “Role of The Fabricator in Labor Productivity.” Journal of Construction Engineering and Management, 126(5), 358-365.
Wijaya, M.H. (2011). Evaluasi Kinerja Half-Slab Akibat Pembebanan Gravitasi dan Gempa Bumi. Skripsi, Fakultas Teknik, Program Studi Teknik Sipil, Universitas Indonesia Depok.
Wijaya, Y.A., and Nugroho, A. (2012). Studi Kasus Pengukuran Produktivitas dan Pengaruh Faktor-faktor pada Pekerjaan Plafon. Skripsi, Fakultas Teknik Sipil dan Perencanan, Universitas Kristen Petra Surabaya
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :