PENURUNAN WAKTU PRE DELIVERY INSPECTION DI AHASS SEPEDA MOTOR HONDA PT EKA PRIMA MANDIRI SENTOSA SURABAYA

Franklyn Tanuwijaya(1*), Joni Dewanto(2),


(1) 
(2) 
(*) Corresponding Author

Abstract


PT Eka Prima Mandiri Sentosa Surabaya is one of the authorized workshops for Honda
motorcycle or commonly referred to as AHASS (Astra Honda Authorised Service Station). As a
company engaged in services, AHASS should be able to give satisfaction to be services. Each
motorcycle unit issued by PT Eka Prima Mandiri Sentosa Surabaya, shall be carried out various
checks and tests PDI. Observations indicate that the travel time of the PDI during takes > 30
minutes. It is, indicates that the travel time of workmanship PDI is considered less effective and
be the one that causes delays in delivery, and lead to reduced consumer satisfaction. The final
task was created with the aim to: 1) improve the speed in which the original PDI system the
average time it takes > 30 minutes, the expected program running process can be finished within
20 minutes; 2) to increase the capacity of PDI motorcycle 17 units per day. Based on the study of
literature and the process of apprenticeship by the Author, due to workmanship is not designed
with the standard operating procedure (SOP) was good, and the absence of check list to make
the stages through which is not according to the SOP which eventually phases may pass and not
appropriate check list. To that end, the author offers some solutions: 1) the design of a special
SOP PDI; 2) a draft checklist PDI; 3) design layouts room PDI; 4) the layout and Mechanics
toolbox.


Keywords


capacity, pre delivery inspection, AHASS HONDA.

Full Text:

PDF

References


Alma, Buchari. (2005). Manajemen Pemasaran dan

Pemasaran Jasa. Bandung: Alfabeta.

Arief, Muhtosim. (2007). Pemasaran Jasa dan

Kualitas Pelayanan. Malang: Bayumedia

Publishing.

Bronson, R. (1993). Teori dan Soal-soal Operation

Research. Jakarta: PT Gelora Aksara Pratama.

Dimyati, A dan Tjutju Tarliah. (2004). Operation

Research Model-Model Pengambilan

Keputusan. Bandung: PT Sinar Baru Algesindo.

Handoko, T Hani. (2002). Dasar-dasar Manajemen

Tipe Motor

Pengerjaan

Sebelum

Program

Dirancang

Pengerjaan

Setelah

Program

Dirancang

Supra & Revo 28:16 20:59

CB & Verza 28:22 20:08

Beat &

Scoopy 29:21 21:47

Vario 125 /

Vario 150 30:52 22:10

CBR 150 29:42 21:20

Rata-Rata

Waktu 29:19 21:17

Page 5 of 5

Produksi dan Operasi. Yogyakarta: BPFE.

Hariyanti, Widi. (2009). Analisis Teori Antrian

Sebagai Penentu Optimalisasi Pelayanan

Konsumen pada Instalasi Farmasi Rumah Sakit

Umum Klipang di Semarang. Semarang.

Heizer, J and Render. (2005). Operation

Management. Jakarta: Salemba Empat.

Kakiay, Thomas J. (2004). Dasar Teori Antrian

Untuk Kehidupan Nyata. Yogyakarta: Penerbit

ANDI.

Kotler. (2002). Manajemen Pemasaran:

Perencanaan, Implementasi, dan Pengendalian.

Jakarta: PT Prenhallindo.

Lupiyoadi, Rambat dan Hamdani. (2006).

Manajemen Pemasaran Jasa. Jakarta: Salemba

Empat.

Mulyono, Sri. (2002). Riset Operasi. Jakarta:

Fakultas Ekonomi Universitas Indonesia.

Nasution, M.N. (2004). Total Service Management.

Bogor: Ghalia Indonesia.

Pangestu S., Marwan A., T. Hani Handoko. (1983).

Dasar-Dasar Operations Research. Yogyakarta:

BPFE.

Sarah, T. (2010). A Residual Time Based

Scheduling: Performance Modeling in M/G/C

Queueing Applications. University of

Connecticut, Storrs, USA. Vol. 3, pp. 746-755.

Sugito dan Marissa Fauziah. (2009). Analisis

Sistem Antrian Kereta Api di Stasiun Besar

Cirebon dan Stasiun Cirebon Prujakan. Media

Statistika, Vol. 2, No. 2, hal. 111-120.

Taha, Hamdy A. (1997). Riset Operasi: Suatu

Pengantar. Jakarta: Binapura Aksara.

Tjiptono Fandy. (2000). Perspektif Manajemen dan

Pemasaran Kontemporer. Yogyakarta: Andi

Offset.

______________. (2005). Strategi Pemasaran.

Yogyakarta: Penerbit ANDI.

______________. (2006). Manajemen Jasa.

Yogyakarta: Penerbit ANDI.

Yazid. (2001). Pemasaran Jasa: Konsep dan

Implementasi. Yogyakarta: Ekonosia.


Refbacks

  • There are currently no refbacks.