Perbaikan Alur Aktivitas VA/VE (TMMIN Proposal) di PT Toyota Motor Manufacturing Indonesia
(1) Industrial Engineering Department, Petra Christian University
(2) Industrial Engineering Department, Petra Christian University
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Monden, Y. (1995). Sistem produksi Toyota 1. Jakarta: Pustaka Binaman Pressindo.
Ohno, T. (1988). The toyota production system: Beyond large scale production. Portland: Productivity Press.
Takami, T. (2014). Production engineering strategies and metalworking at TMC. Procedia Engineering Journal, 81, 5-17.
Montgomery, D. C. (2009). Introduction to statistical quality control, sixth edition. Jefferson City: John Wiley & Sons, Inc.
Chakraborty, A. (2016). Importance of pdca cycle for smes. SSRG International Journal of Mechaninal Engineering, 3(5), 30-34.
Bose, T. K. (2012). Application of fishbone analysis for evaluating supply chain and business process: A case study on the st james hospital. International Journal of Managing Value and Supply Chains, 3(2), 17-24.
Hatto, P. (2010). Standards and standardization handbook. Brussel: European Commision.
Rosing, M. V., et al. (2015). The complete business process handbook. New York: Elsevier Inc.
Romney, M. B. & Steinbart, P. J. (2012). Accounting information system 12th edition. Prentice Hall: New Jersey.
Toyota Institute. (2016). Ji kotei-kanketsu, built-in quality with ownership. Jakarta: Toyota Motor Manufacturing Indonesia.
Refbacks
- There are currently no refbacks.