PERBAIKAN SISTEM PRODUKSI DAN JADWAL PENGIRIMAN KOMPONEN PADA PT. FSCM MANUFACTURING INDONESIA
(1) Jurusan Teknik Industri Universitas Kristen Petra
(2) Jurusan Teknik Industri Universitas Kristen Petra
(*) Corresponding Author
Abstract
Abstract: This study was done to control the delivery system components of Plant 1 to Plant 2 for the machine assembly is not off. The main problem faced by PT. FSCM Manufacturing Indonesia is not their delivery schedules so that components are submitted can not be controlled. The next problem is the production Planning is administered orally and the misscomunication between foremen and operators that cause components to ASF (After Surface Finishing) empty. Improvement award is to create the delivery schedule number and weight of components with components that have been determined. Make a design planning card to make the order type of components to be processed so that the planning of production to be sustainable and ASF components will not be empty. To draft a new component card for improving the quality of the product components
Keywords
Improvement of Production Systems, Production Scheduling
Full Text:
PDFReferences
Sutalaksana, Iftikar Z.( 1979) Teknik Tata Cara Kerja. Bandung: Institute Teknologi Bandung.
Nurmianto, E. (2008). Ergonomi: Konsep dasar dan aplikasinya. Surabaya: Teknik Industri-ITS