ANALISA FAKTOR-FAKTOR PENYEBAB REWORK DAN TINGKAT KESULITAN PECEGAHANNYA PADA PEKERJAAN STRUKTUR, FINISHING, DAN MEP
(1) Magister Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Burati, J. L., Farrington, J. J., and Ledbetter, J. B. (1992). Causes of Quality Deviations in Design and Construction. Journal of Construction Engginering and Management, 10.1061/(ASCE)0733-9364(1992)118:1(34), 34-39
Chundawan, E., Alifen, R. S. (2014). Model Sumber dan Penyebab Rework pada Tahapan Proyek Konstruksi. Civil Engineering Dimension, Vol 1, No. 1
CIDA. (1995). Measuring up pr Muddling Tough: Best Practice in The Australian Non-Residential Construction Industry, Development Agency and Masters Builders Australia, Sydney Australia, pp.59-63.
COOA. (2001). Field Rework Committee Meeting Minutes, 28 September 2001. Construction Owners Association of Alberta (COAA), Edmonton, Alta.
Fayek, A. R., Dissanayake, M., Campero, O. (2004) Developing a Standard Methodology for Measuring and Classifying Construction Field Rework. Canadian Journal of Civil Engineering. 31: 1077-1089.
Hwang, B., Thomas, S. R., Haas, C. T., and Caldas, C. H. (2009). Measuring The Impact of Rework on Construction Cost Performance. Journal of Construction Enginering and Management, 135, 187-198.
Love, P. E. D., Edwards, D. J., Watson, H., and Davis, P. (2010). Rework in Civil Infracstructure Projects : Determiantion of Cost Predictior. Journal of Construction Enginering and Management, 136, 275-282.
Love, P. E. D. (2002). Influence of Project Type and Procurement Method on Rework Cost in Building Construction Projects. Journal of Construction Enginering and Management, 128, 18-29.
Rogge, D. F., Cogliser, C., Alaman, H., and McCormack, S. (2001). An Investigation of Field Rework in Industrial Construction, Construction Industry Institute, Austin, TX.
Taylor, T., and Ford, D. (2008). Managing Tipping Point Dynamics in Complex Construction Projects. Journal of Construction Enginering and Management, 10.1061/(ASCE) 0733-9364(2008)134:6(421), 421-431.
Winata, S., Hendralim, Y., Andi. Faktor-Faktor Penyebab Rework pada Pekerjaan Konstruksi. (2005). Civil Engineering Dimension, Vol 7, No. 1, 22-29.
Zhang, D., Haas, C. T., Goodrum, P. M., Carlos, H. C., and Robin, G. (2012). Construction Small-Project Rework Reduction for Capital Facilities. Journal of Construction Enginering and Management, 138, 1377-1385.
Ye, G., Jin, Z., Xia, B., and Martin. (2014). Analyzing Causes for Reworks in Construction Projects in China. Journal of Construction Enginering and Management, 04014097.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :