Author Details
Andi, Andi, Dosen Program Studi Teknik Sipil Universitas Kristen Petra, Indonesia
-
Vol 4, No 1 (2015) - Articles
PERBANDINGAN PPC DAN FAKTOR-FAKTOR YANG MEMPENGARUHI PADA DUA PROYEK APARTEMEN
Abstract
PDF
-
Vol 4, No 1 (2015) - Articles
PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN GALIAN GEDUNG P1 P2 UK PETRA
Abstract
PDF
-
Vol 4, No 2 (2015): AGUSTUS 2015 - Articles
INSPEKSI FABRIKASI DAN EREKSI PADA KONSTRUKSI BAJA PROYEK GEDUNG P1-P2 UK PETRA SURABAYA
Abstract
PDF
-
Vol 5, No 2 (2016): AGUSTUS 2016 - Articles
PERENCANAAN DAN EVALUASI KESELAMATAN KERJA PEKERJAAN PEMANCANGAN PADA PROYEK “X” DI SURABAYA
Abstract
PDF
-
Vol 6, No 1 (2017): FEBRUARI 2017 - Articles
PANDANGAN KONTRAKTOR TERHADAP KLAUSUL-KLAUSUL KONTRAK PADA PROYEK KONSTRUKSI
Abstract
PDF
-
Vol 6, No 1 (2017): FEBRUARI 2017 - Articles
MONITORING JADWAL SUATU PROYEK SEKOLAH DENGAN MENGGUNAKAN METODE SPI DAN PPC
Abstract
PDF
-
Vol 6, No 2 (2017): AGUSTUS 2017 - Articles
PERBANDINGAN TINGKAT KEPENTINGAN DAN KEPUASAN ANTARA INSENTIF FINANSIAL DAN INSENTIF NON-FINANSIAL BAGI STAF KARYAWAN LAPANGAN DAN KANTOR
Abstract
PDF
-
Vol 7, No 1 (2018): FEBRUARI 2018 - Articles
FAKTOR – FAKTOR YANG MEMPENGARUHI LABOR TURNOVER DAN DAMPAKNYA PADA PROYEK KONSTRUKSI DI SURABAYA
Abstract
PDF
-
Vol 7, No 1 (2018): FEBRUARI 2018 - Articles
FAKTOR – FAKTOR PENGHAMBAT KONTRAKTOR UNTUK MELAKSANAKAN K3 PADA PROYEK KONSTRUKSI
Abstract
PDF
-
Vol 7, No 2 (2018): AGUSTUS 2018 - Articles
MODEL PENILAIAN KEPEMIMPINAN MANAJER PROYEK YANG DIHARAPKAN BAWAHAN BERDASARKAN KRITERIA PERILAKU KEPEMIMPINAN
Abstract
PDF
-
Vol 7, No 2 (2018): AGUSTUS 2018 - Articles
FAKTOR PENYEBAB TINDAKAN TIDAK AMAN PEKERJA PADA PROYEK KONSTRUKSI
Abstract
PDF
-
Vol 7, No 2 (2018): AGUSTUS 2018 - Articles
FAKTOR – FAKTOR PENYEBAB POOR WORKMANSHIP DAN ANTISIPASINYA PADA PROYEK KONSTRUKSI DI SURABAYA
Abstract
PDF
-
Vol 7, No 2 (2018): AGUSTUS 2018 - Articles
PERMASALAHAN KONTRAK LUMP-SUM PADA PROYEK-PROYEK KONSTRUKSI DI SURABAYA
Abstract
PDF
-
Vol 8, No 1 (2019): FEBRUARI 2019 - Articles
TINGKAT KEPENTINGAN DAN KEPUASAN INSENTIF FINANSIAL DAN INSENTIF NON-FINANSIAL BAGI STAF KANTOR PERUSAHAAN KONSULTAN
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
ANALISA TINGKAT KEPENTINGAN RSIIKO KECELAKAAN KERJA PADA PROYEK KONSTRUKSI
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
ANALISIS FAKTOR-FAKTOR KINERJA K3L SUBKONTRAKTOR PADA PROYEK-PROYEK DI SURABAYA
Abstract
PDF
-
Vol 8, No 2 (2019): AGUSTUS 2019 - Articles
PENGGUNAAN MICROSOFT PROJECT UNTUK ANALISA KETERLAMBATAN PEKERJAAN STRUKTUR SUATU PROYEK DENGAN METODE TIME IMPACT ANALYSIS
Abstract
PDF
-
Vol 11, No 1 (2022): Februari 2022 - Articles
HUBUNGAN KEPEMIMPINAN MANAJER PROYEK DAN TINGKAT KEPERCAYAAN TIM PADA PROYEK KONSTRUKSI DI SURABAYA
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
PERBANDINGAN UNSAFE ACT PADA JAM KERJA NORMAL DENGAN JAM KERJA LEMBUR PARA PROYEK “X”
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
MODEL PEMILIHAN PROJECT DELIVERY METHODS DENGAN ANALYTICAL HIERARCHY PROCESS
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
ANALISIS DIFFERING SITE CONDITIONS PADA PROYEK KONSTRUKSI DI SURABAYA
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
TRAFFIC CONGESTION INDEX OF THE TOP 300 LARGEST CITIES IN THE WORLD BASED ON UNCALIBRATED IFN
Abstract
PDF
-
Vol 11, No 2 (2022): September 2022 - Articles
PANDANGAN HARAPAN DAN REALITA KONTRAKTOR TERHADAP PERANAN OWNER DALAM KESELAMATAN KERJA PADA PROYEK GEDUNG BERTINGKAT DI SURABAYA
Abstract
PDF