UPAYA PENERAPAN SCHEDULE ASSESSMENT MENGGUNAKAN STANDARD PMI, GAO, DCMA, DAN NDIA PADA BEBERAPA PROYEK DI SURABAYA DAN SEKITARNYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Alifen, Ratna S. (1999). Analisa “What If” Sebagai Metode Antisipasi Keterlambatan Durasi Proyek. Dimensi Teknik Sipil (Vol. 1).
Bogle, B. (2016). DCMA 14-Point Assessment for Project Schedule Health. Edwards Performance Solutions.
Defense Contract Management Agency. (2012). Earned Value Management System (EVMS) Program Analysis Pamphlet (PAP).
Makar, A. (2014). Project Schedule Quality 101: 14 Ways to Improve Your Project Schedule. Project Schedule. Dikutip 16 Februari 2019 dari http://www.tacticalprojectmanagemet.com/project-schedule-quality-101/
National Defense Industrial Association. (2016). Planning & Scheduling Excellence Guide (PASEG). National Defense Industrial Association.
Persons, T.M. (2015). Schedule Assesment Guide: Best Practices for Project Schedules. GAO-16-89G. Washington, D.C.
Proboyo, Budiman. (1999). Keterlamatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat Dari Penyebab-Penyebabnya. Dimensi Teknik Sipil (Vol.1).
Project Management Institute. (2011). Practice Standard for Scheduling – Second Edition. Pennsylvania: Project Management Institute.