IDENTIFIKASI DAN ALOKASI RISIKO-RISIKO PADA PROYEK SUPERBLOK DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Krsiten Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Andi. (2006). “The Importance and Allocation of Risks in Indonesian Construction Projects”, Construction Management and Economics, vol. 24, no. 1, pp. 69-80.
Al-Bahar, J.F. and Crandall, K.C. (1990), Systematic Risk Management Approach for Construction Projects. Journal of Construction Engineering and Management, 116 (3), 533-546.
Fisk, E.R. dan Reynolds, W.D. (2006). Construction Project Administration. USA: Prentice Hall, New Jersey.
Kangari, R. (1995). “Risk Management Perceptions and Trends of US Construction”, Journal of Construction Engineering and Management, ASCE, vol. 121, no. 4, pp. 422-429.
Levitt, Raymond E., David B. Ashley and Robert D. Logcher. (1980). “ Allocating Risk and Incentive in Construction.”Journal of the Construction Division. ASCE. 106(CO3).
Loosemore, M., Raftery, J., Reilly, C., dan Higgon, D. (2006) Risk Management in Projects (2nd edition), New York, USA.
Royal Society. (1991). Reports of the Study Group on Risk: Analysis, Perception, and Management, London: (group co-ordinator Sir F. Warner), Royal Society.
Smith, R.G. & Bohn, C.M. (1999).”Small to Medium Contractor Contingency and Assumtion of Risk.” Journal of Construction Engineering and Management.ASCE. 125.
Smith, R.J. (1992). “Risk Management for Underground Projects: Cost Saving Techniques and Practices for Owner”. Tunneling and Underground Space Technology, 7 (2), 109-177.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :