ANALISIS FAKTOR FAKTOR YANG BERPENGARUH PADA JADWAL REALISASI PADA PROYEK BENDUNGAN DI NGANJUK, SUMBAWA, DAN NTT
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Abbasi, S. A. (2018). “Causes of Delay In Construction of Dams In Pakistan”. Proceedings of The First International Conference on Industrial Engineering and Management Applications Amoudi. (2017). “Analysis of Construction Delay Causes In Dams Projects In Oman”. European Journal of Business and Social Sciences.Vol. 6, No. 02 Khar, G. K (2015). Critical Success Factors of Project Management for Dam Construction Projects in Myanmar. (Dissertation. BRAC University,Dhaka) Indonesia. Menteri Pekerjaan Umum dan Perumahan Rakyat. (2020). Perencanaan Bangunan Utama Bendungan. Jakarta: Author. Kamalan (2020). “Root Cause Analysis of Delays in Dam Construction (Case Studies: Karun-3, Marun, Shafaroud, and Jamishan Dams)”. Journal of Hydraulic Structures J. Hydraul. Struct., 2020; Vol 6.no(3):45-
Lewis (2005). “Ecological Engineering for Successful Management and Restoration of Mangrove Forest”. Journal of Ecological Engineering, United State of America Shenhar et al (1997). “Project Success : A Multidimensional Strategic Concept”. Journal Long Range Planning” Vol 28, n02 pp-5-13.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :