PENGGUNAAN METODE METAHEURISTIK DALAM OPTIMASI TIME-COST TRADE OFF DURASI PELAKSANAAN PROYEK KONSTRUKSI DENGAN PENAMBAHAN DAN PENGURANGAN TENAGA KERJA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Cheng, M., Prayogo, D., Wu, Y., & Lukito, M. M. (2016). A Hybrid Harmony Search Algorithm for Discrete Sizing Optimization of Truss Structure. Automation in Construction, 69, 21-33. https://doi.org/10.1016/j.autcon.2016.05.023
Cheng, M. Y., & Prayogo, D. (2014). Symbiotic Organisms Search: A New Metaheuristic Optimization Algorithm. Computers and Structures, 139, 98–112.https://doi.org/10.1016/j.compstruc.2014.03.007 .
Eberhart, R., & Kennedy, J. (1995). New Optimizer Using Particle Swarm Theory. Proceedings of the International Symposium on Micro Machine and Human Science, 39–43.
Feng, C. W., & Liu, L. (1997). Using Genetic Algorithms to Solve Connection Time-Cost Trade Off Problems. Journal of Computing in Civil Engineering, (11), 184-189.
Lidwyna, F., & Taufik, H. (2016). Analisis Percepatan Keterlambatan Proyek (Study Kasus : Kantor Dinas SKPD Pemko Gedung B2 di Tenayan Raya). Jom FTEKNIK Volume 3 No.2 Oktober 2016.
Proboyo, B. (1999). Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat dari Penyebab-Penyebabnya. Dimensi Teknik Sipil Volume 1 Nomor 2 September 1999, 49-58. https://doi.org/10.1016/j.compstruc.2014.03.007
Yang, I. (2006). Performing Complex Project Crashing Analysis with Aid of Particle Swarm Optimization Algorithm. International Journal of Project Management 25 (2007), 637-646. https://doi.org/10.1016/j.ijproman.2006.11.001
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :