SURVEY TERHADAP KEPUTUSAN KONTRAKTOR DI SURABAYA UNTUK MENINGKATKAN PRODUKTIVITAS PROYEK
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Arditi, D. & Mochtar, K. (1999). Productivity Improvement in The U.S. Construction Industry. Journal Construction and Economics Jurusan Teknik Sipil, Institut Teknologi Illinois, Chicago, IL, USA.
Aprilian, T. (2010). Analisis Produktivitas Tenaga Kerja pada Pekerjaan Struktur Rangka Atap Baja [skripsi]. Universitas Sebelas Maret, Surakarta.
Aziz, R. F., Hafez, S. M. (2013). Applying Lean Thinking in Construction and Performance Improvement. Alexandria Engineering Journal, 52(4), p.679-695.
Hanna, A. S., Camlic, R., Peterson, P. A., & Nordheim, E. V. (2002). Quantitative Definition of Projects
Impacted by Change Orders. Journal of Construction Engineering and Management, 128(1), 57–64.
Junaidi, (2015). Statistik Uji Kruskal-Wallis. Fakultas Ekonomi Universitas Jambi. Jambi
Jenkins, J. & Orth, D. (2003). Productivity Improvement through Work Sampling. AACE International Transactions of the Annual Meeting. CSC.5.1-CSC.05.7.
Kuswanto, Dedy. 2012. Statistik untuk Pemula dan Orang Awam. Laskar Aksara: Jakarta.
Shinde V. J.1, Hedaoo M. N., “A Review on Productivity Improvement in Construction Industry”, International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 11, Nov. 2017
Siregar, S. (2012). Metode Penelitian Kuantitatif Dilengkapi dengan Perbandingan Perhitungan Manual dan SPSS. Prenadamedia Group: Jakarta.
Wahyuni, Noor. (2014). Uji Validitas dan Realibilitas. https://qmc.binus.ac.id/2014/11/01/u-j-i-v-a-l-i-d-i-t-a-s-d-a-n-u-j-i-r-e-l-i-a-b-i-l-i-t-a-s/ (diakses tanggal 23 November 2019)
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :