Perancangan Sistem Planned Maintenance dan Man Power Planning di PT X

Authors

  • David Soebiantoro
  • Siana Halim

Keywords:

Budgeting participation, Job Relevant Information, Managerial Performance, Partial Least Square (PLS).

Abstract

The purposes of this thesis are designing a planned maintenance and man power planning in the maintenance department of PT X Previously, the PT X used breakdown and cor­rec­tive maintenance. The maintenance procedures will be revised into corrective main­tenance and when continuous pro­duction system is executed, corrective & preventive maintenance will be applied. For defining those procedures, first we identified the machines’ failure and redesign­ed the production system. Additionally, we propose four level of man power planning based on their skill and company management want it divide into four level.

Downloads

Published

2013-07-08

Issue

Section

Articles