Penjadwalan Jobshop di CV. Sinar Indah Teknik

FELICIA ANGGUN KUSUMA(1*), TANTI OCTAVIA(2),


(1) JURUSAN TEKNIK INDUSTRI UNIVERSITAS KRISTEN PETRA
(2) JURUSAN TEKNIK INDUSTRI UNIVERSITAS KRISTEN PETRA
(*) Corresponding Author

Abstract


CV. Sinar Indah Teknik is a service company that receives orders based of plates and hollow pipes in a variety product forms. Acceptance of the orders makes frequent delays in the company. This is caused by the absence of proper shceduling system because the company does not know how much time will take to make one product with a specific type. Products that made from a plat and hollow pipe can be classified into eight types of products. Based on these types of product, there are 14 processes with 34 work elements to make the iron products.  The process of data collection is done using the Stopwatch Time Study. Time data obtained and calculated into standard data. Those standard data will be used in job shop scheduling scheme using CDS methods. The results of CDS methods in scheduling can minimize the number of tardy job.

Keywords


Standart Time, Scheduling, Campbell Methods, Number of Tardy Job

Full Text:

PDF

References


Wignjosoebroto, Sritomo. (1986). Motion and Time Study (3rded). Surabaya : Guna Widya.

Wignjosoebroto, Sritomo. (1986). Teknik Tata Cara dan Pengukuran Waktu Kerja. Jakarta: Guna Widya.

Pinedo, Michael. (2001). Scheduling : Theory, Algorithms, and Systems (2nded). United States : Prentice Hall.

Conway, Richard W., Maxwell, William L., & Miller, Luois W. (2003). Theory of Scheduling. United States : Dover Publication.

Baker, Kenneth R. (2009). Principles of Sequencing and Scheduling. United States : Wiley.


Refbacks

  • There are currently no refbacks.