PT.Y is a company that produce cigarette. Currently PT.Y wants to revise the spare part receiving system that was applied. Spare part receiving process first start at main store, then will be delivered to sub store. The improvement that wants to be applied is to eliminate the main store, so that spare part can be delivered directly to warehouse sub store. By portraying the current process using value stream mapping, two waste could be eliminated if warehouse main store role is erased. Unnecessary transportation and over processing is the occurring waste in these process. The proposed counter measure is to change all store location for all material in the data base so that when PR was created the store location will automatically determine the real receiving warehouse. The proposed counter measure can shorten the processing time by 16.918,91 second per day. Counter measure can also decrease transportation fees by Rp.6.140,00 per day.

Keywords


Spare part, Warehouse, Value Stream Mapping, Waste

Full Text:

PDF

References


N. J. a. W. B. Sayer, Lean For Dummies, Canada: Wiley Publising, Inc., 2007.

M. d. S. J. Rother, Lean to See, USA: Lean Enterprise Institue Value Stream Mapping Method. , 1999.

J. K. Liker, The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer, United States: McGraw-Hill., 2004.


Refbacks

  • There are currently no refbacks.