PENURUNAN TINGKAT KECACATAN DI PT. MITRA ANUGRAH
(1) Jurusan Teknik Industri Universitas Kristen Petra
(*) Corresponding Author
Abstract
This study focuses on the decrease of defects in the critical stage of the production of Kolonel type shoes in PT. Mitra Anugrah. The sewing process and inject process are the most critical process of the production sequence of the shoes. The initial defect rate on the sewing process is 3.35% and on the inject process is 1.22%. The data after implementation shows that the inject process experiences a decrease of defects to 0.97%. On the sewing process, the research is diverted to a sub-contractor by analyzing the percentage of defects in every sub-contractor and making a solution of the problems. Quality plan is only for the critical processes. Daily form and monthly form are made to simplify record keeping in the process of inspecting the sewing sub-contractor. The dimension of the control of the inject process are composisiton and temperature. Dimension of control on the sewing process is the inspection in the sewing department.
Keywords
The Decrease of Defect Rate, Critical Process, Quality Plan
Full Text:
PDFReferences
Feigenbaum, A.V. (1991). Kendali mutu terpadu. Jakarta: Erlangga
Montgomery, Douglas C (2005). Introduction to stastitical quality control (5th ed).New York: John Wiley & Sons, INC
Besterfield, Dale H (2004). Quality Control (7th ed). New Jersey
Gaspers. V. (2002). Pedoman Implementasi Program Six Sigma Terintegrasi dengan ISO 9001:2000,MBNQA, dan HACCP. Jakarta: Gramedia
Refbacks
- There are currently no refbacks.