Perbaikan Tata Letak Fasilitas dengan Mempertimbangkan Keseimbangan Lintasan (Studi Kasus)

Priscilla Gandasutisna(1*), Tanti Octavia(2),


(1) 
(2) 
(*) Corresponding Author

Abstract


PT. X is a job-order plastic packaging industry using line flow in their floor. Currently, the company faces the imbalance line flow and a long transportation time. The goal of this final project is to balance a production line and reduce the transportation time. A proposed facitily Layout and balanced production line are implemented. The result shows Line Efficiency for powder compact products increase from 61.83% to 80.77%, for pot products decrease 80.14% to 72.85% and for eyeshadow compact products increase 74.22% to 81.86%.  A proposed layout gives the better solution compare to existing layout in term of moment.


Keywords


Line Balancing, Line Efficiency and Facility Design Layout

Full Text:

PDF

References


Gasperz, Vincent. (2001). Production Planning and Inventory Control Berdasarkan Pendekatan Sistem Terintegrasi MRP II dan JIT Menuju Manufakturing 21. Jakarta: Gramedia Pustaka Utama

Elsayed, Elsayed A. & Boucher, Thomas O. (1994). Analysis and control of Production Systems. New Jersey: Prentice-Hall, Inc.

Wignjosoebroto, Sritomo. (2006). Ergonomi studi gerak dan waktu (4th ed.).Surabaya: GunaWidya.

Barnes, Ralph M. (1990). Motion and time study: Design and Measurement of Work. New York: John Wiley & Sons.

Sutalaksana, I Z., Anggawisastra, R. & Tjakraatmadja, John H. (1979). Teknik

Tata Cara Kerja. Bandung: Jurusan Teknik Industri Institut Teknologi Bandung.

Sutalaksana, I Z., Anggawisastra, R. &

Tjakraatmadja, John H. (2006). Teknik Perancangan Sistem Kerja Edisi Kedua. Bandung: Jurusan Teknik Industri Institut Teknologi Bandung


Refbacks

  • There are currently no refbacks.