Perbaikan Tata Letak Fasilitas dengan Mempertimbangkan Keseimbangan Lintasan (Studi Kasus)

Authors

  • Priscilla Gandasutisna
  • Tanti Octavia

Keywords:

Akustik, fasilitas hiburan, reverberation time, sightline, teater.

Abstract

PT. X is a job-order plastic packaging industry using line flow in their floor. Currently, the company faces the imbalance line flow and a long transportation time. The goal of this final project is to balance a production line and reduce the transportation time. A proposed facitily Layout and balanced production line are implemented. The result shows Line Efficiency for powder compact products increase from 61.83% to 80.77%, for pot products decrease 80.14% to 72.85% and for eyeshadow compact products increase 74.22% to 81.86%.  A proposed layout gives the better solution compare to existing layout in term of moment.

References

1. Gasperz, Vincent. (2001). Production Planning and Inventory Control Berdasarkan Pendekatan Sistem Terintegrasi MRP II dan JIT Menuju Manufakturing 21. Jakarta: Gramedia Pustaka Utama

2. Elsayed, Elsayed A. & Boucher, Thomas O. (1994). Analysis and control of Production Systems. New Jersey: Prentice-Hall, Inc.

3. Wignjosoebroto, Sritomo. (2006). Ergonomi studi gerak dan waktu (4th ed.).Surabaya: GunaWidya.

4. Barnes, Ralph M. (1990). Motion and time study: Design and Measurement of Work. New York: John Wiley & Sons.

5. Sutalaksana, I Z., Anggawisastra, R. & Tjakraatmadja, John H. (1979). Teknik

Tata Cara Kerja. Bandung: Jurusan Teknik Industri Institut Teknologi Bandung.

6. Sutalaksana, I Z., Anggawisastra, R. &

Tjakraatmadja, John H. (2006). Teknik Perancangan Sistem Kerja Edisi Kedua. Bandung: Jurusan Teknik Industri Institut Teknologi Bandung

Downloads

Published

2016-07-15