Penerapan Weekly Order Change untuk Mengurangi Waktu Pemesanan di PT Toyota Motor Manufacturing Indonesia

Kevin Alim Sompie(1*), I Gede Agus Widyadana(2),


(1) Jurusan Teknik Industri Universitas Kristen Petra
(2) Jurusan Teknik Industri Universitas Kristen Petra
(*) Corresponding Author

Abstract


PT Toyota Motor Manufacturing Indonesia (TMMIN) have business at export service part. This business have problem at procuring time from Toyota Astra Motor (TAM) as customer to TMMIN. Lead time for TAM order to TMMIN is 13 days while the standard procuring time is 2 days. The differences make some order status is backorder or delay. The differences caused by TMMIN procuring timing only once every month. This study give advice to using weekly order change (WOC). WOC can be applied but need to consider production capacity and raw material limit. That factor will be used for limitation at simulation. Simulation will use order date at backorder shipment and emergency order data from January until March 2016. Data will be used for simulation input with limitation at production capacity and raw material. Current lead time ordering process can be reduce until 3 days with WOC.

Keywords


Weekly Order Change, Simulation, Lead Time, Production Capacity

Full Text:

PDF

References


Monden,Yasuhiro.1995. Sistem Produksi Toyota “Suatu Ancangan Terpadu untuk Penerapan Just-In-Time First Edition”. Jakarta: PT Pustaka Binaman Pressindo

Toyota Motor Corporation, 2006. Toyota Production System. Japan : Author

Toyota Institute, 2005. Toyota Business Practices. Japan : Author

Hutagalung, I. R. (2013). Perencanaan Kebutuhan Kapasitas Produksi pada PT XYZ. e-jurnal teknik industri FT USU Vol2,no 1, 17.


Refbacks

  • There are currently no refbacks.