Perancangan Tata Letak untuk Sentralisasi

Edoward Nata Susanto(1*), Prayonne Adi(2),


(1) Jurusan Teknik Industri Universitas Kristen Petra
(2) Jurusan Teknik Industri Universitas Kristen Petra
(*) Corresponding Author

Abstract


This study focuses on designing layout for PT. FSCM Manufacturing Indonesia. This study is done because there is a centralization of sanyung furnace machine in plant 3. The centralization of sanyung furnace will make the entire pin and bush component being processed in plant 3. The suggestion given is to displace pin cutting machine and bush forming machine that is the pin and bush component machine maker to plant 3. The displacement of pin cutting machine and bush forming machine needs a new layout design. The method that is used in this study is BLOCPLAN method. This method is selected because this method uses hybrid algorithm. The selected layout is the third proposal layout with a moment of 100.035,46. The centralization of sanyung furnace makes changes on the level stock of WIP component therefore; it needs a new layout design. The layout of WIP component uses the concept of fast moving and slow moving. The design of this layout requires an investment cost of Rp. 160.561.000,00 and the saving obtained Rp. 60.102.240,98 per month. The saving obtained in terms of the man power, loading cost and transfer of the component WIP. This investment may be feasible because this investment will come back for 4 months and can increase profit financially.

Keywords


Facility Layout, BLOCPLAN, Storage, Payback Period

Full Text:

PDF

References


Wignjosoebroto, S. Tata Letak dan Pemindahan Bahan (3rd ed). Surabaya: Guna Widya, 2003.

Heragu, S. Facilities Design. Boston: PWS Plublishing Company, 1997.

Warman, J. Manajemen Pergudangan. Jakarta: Pustaka Sinar Harapan, 2004.

Giatman, M. Ekonomi Teknik (1st ed). Jakarta: RajaGrafindo Persada, 2006.


Refbacks

  • There are currently no refbacks.