Perbaikan Tata Letak Fasilitas Di PT. Aweco Indosteel Perkasa Gempol, Pasuruan

Joshua Richard(1*),


(1) 
(*) Corresponding Author

Abstract


Current workshop layout of PT. Aweco Indosteel Perkasa is not optimal. Therefore workshop layout improvement is needed. The improvement indicator which is used is moment without considering the cost. Total moment of initial layout is 64.630. The improvement using two improvement methods, they are 2-Opt and CRAFT. Moment of improvement layout using 2-Opt method is 61.584. Meanwhile, moment of improvement layout using CRAFT method is 47.511. Besides that, moment of improvement layout based on company’s provisions is 57.855. The best improvement layout is resulted from CRAFT method. But, the selected layout improvement need to be adjusted again with the company’s provisions. The final moment of selected layout is 55.550.

Keywords


Improvement Layout; CRAFT Method; 2-Opt Method.