Perancangan Pengendalian Bahaya Pada PT. Alpha Graha Industri
Keywords:
just in time, dashboard, over dimension overload (ODOL)Abstract
PT. Alpha Graha Industri is a company that produces alpha carts. There have
been several work accidents at the production site of PT. Alpha Graha Industries. This
final assignment was carried out using direct observation methods and interviews with
company owners and local workers. The purpose of this final project is to reduce the
number of work accidents at PT. Alpha Graha Industries. From the results of the
analysis that occurred, it was found that 22 activities in the production process had risk
analysis values of 59% high, 13.7% moderate and 27.3% low which could cause work
accidents. 32 risk control proposals have been proposed which are dominated by 50%
technical engineering, 34.4% Personal Protective Equipment and 15.6% administration.
The proposal given by the author has been approved by the company. It is predicted that
the risk rating of the activities will be 100% low.
References
1. Standard Australia License. (2004). AS/NZS 4360:2004 Risk Management Guideline Standards Australia. Brisbane: ISMCPI.
2. Adzim, I.(2021,Juni 26). Dasar-Dasar K3.
3. Rachmina, Dwi. (2021). Penilaian Risiko-In General. Jakarta: Indonesia Risk Management Professional Association.