Perancangan Pengurangan Lead Time Produksi pada Perusahaan Produksi Mebel

I Dewa Made Tastra Asrama(1*), I Nyoman Sutapa(2),


(1) Industrial Engineering Department, Petra Christian University
(2) Industrial Engineering Department, Petra Christian University
(*) Corresponding Author

Abstract


This furniture production company has a problem with it’s slow production lead time. The company was given a target by the customer to complete the product within 9 days, but the product was completed in 11,59 days. The method used is value stream mapping, fishbone diagram, improvement using brainstorming method, and control using administrative control. The root cause of the slow production lead time is in the welding process that there’s no Standard Operating Procedure (SOP) and in the weaving process due to some workers unskilled in weaving. The proposal from this design is to make welding SOPs and provide training to slow workers so they can work faster.


Keywords


lead time; furniture; value stream mapping

Full Text:

PDF

References


Gaspersz, V., Pedoman Implementasi Program Six Sigma, Gramedia, 2002, retrieved from http://www.vincentgaspersz.com/free-pdfs/ on 08 July 2021.

Gaspersz, V., Cutting Through Complexity: The Analytical Activist’s Guide to Solving the Complete Sustainability Problem with Root Cause Analysis, 2019, retrieved from http://www.vincentgaspersz.com/free-pdfs/ on 08 July 2021.

Rother, M., and Shook, J., Learning to See: Value Stream Mapping to Create Value and Eleminate MUDA, The Lean Enterprise Institute Brookline, Massachusetts, 1999.


Refbacks

  • There are currently no refbacks.