Perancangan Sistem Pemantauan untuk Meningkatkan Pencapaian Realisasi dengan Perencanaan Painting di PT X
(1) Industrial Engineering Department, Petra Christian University
(2) Industrial Engineering Department, Petra Christian University
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Wignjosoebroto, S., Ergonomi Studi Gerak dan Waktu: Teknik Analisis Peningkatan Produktivitas, Guna Widya, 2003.
Freivalds, A. and Niebel, B. W., Niebel’s Methods, Standards, and Work Design (13th ed), McGraw-Hill Education, 2013.
Amalia, A., Faktor Penyesuaian dan Allowance [Paper presentation], 2013, retrieved from https://repository.dinus.ac.id/docs/ajar/2017_APK_09_-_Faktor_Penyesuaian_Allowance.pdf on 5 February 2022.
Coccia, M., The Fishbone Diagram to Identify, Systematize and Analyze the Sources of General Purpose Technologies, Journal of Social and Administrative Sciences, 4(4), 2017, pp. 291-303.
Gaspersz, V., Manajemen Produktivitas Total, Strategi Peningkatan Produktivitas Bisnis Global, Gramedia Pustaka Utama, 1998.
Kendall, K.E. and Kendall, J.E., Analisis dan Perancangan Sistem, Indeks, 2002.
Hidayati, N., Modul Sistem Basis Data, Universitas Bina Sarana Informatika, 2012.
Widayati, A., Penelitian Tindakan Kelas, Jurnal Pendidikan Akuntansi Indonesia, 6(1), pp. 87-93, 2008.
Gabriele, G., Analisis penerapan Standar Operasional Prosedur (SOP) di Departemen Marketing dan HRD PT Cahaya Indo Persada, Artikel Ilmiah Jurnal Agora, 6(1), 2018.
Refbacks
- There are currently no refbacks.