Perancangan Dokumen Hazard Identification Risk Assessment and Risk Control (HIRARC) pada Proyek Otomasi Chiller Plant PT XYZ

Joshua Winata(1*), Kriswanto Widiawan(2),


(1) Industrial Engineering Department, Petra Christian University
(2) Industrial Engineering Department, Petra Christian University
(*) Corresponding Author

Abstract


PT XYZ is a company engaged in the service sector, namely the automation of the chiller plant system. There have been several work accidents at the PT XYZ project site. This final project was carried out using direct observation in the project field and interviews with field supervisors and employees. This final project aims to help companies to reduce the potential for work accidents that occur. From the result of the final project analysis, obtained 17 activites that are dangerous in the work process. Of the total 17 work accidents, severity is in the medium and high categories. 33 proposal for hazard risk control have been proposed, dominated by administrative control and PPE. Proposed control that has been given by the author and has been approved by the company. After the proposed control is given, the predicted severity of all 17 potential work accidents in the low category

Keywords


HIRARC; otomasi chiller plant; kecelakaan kerja

Full Text:

PDF

References


Standard Australia. Risk Management Guidelines Companions to AS/NZS 4360:2004.

Loosemore, M., Raftery, J., Reilly, C., and Higgon, D. Risk Management in Projects. Taylor & Francis. London, 2006.

Mahendra, R., Hierarki Pengendalian Bahaya dalam OHSAS 18001:2007, ISO Center Indonesia, 2016, retrieved from https://isoindonesiacenter.com/ hierarki-pengendalian-bahaya-dalam-ohsas 180012007/ on 27 December 2020.


Refbacks

  • There are currently no refbacks.