Upaya Peningkatan Kapasitas Produksi Proses Bagging Off pada PT. Japfa Comfeed Indonesia

Cornelius Victor Prastono(1*),


(1) Industrial Engineering Department, Petra Christian University
(*) Corresponding Author

Abstract


Currently, PT Japfa Comfeed Indonesia Tbk wants to increase the capacity of the bagging off process to 13,400 sacks per shift. The bagging process capacity of PT Japfa Comfeed Indonesia Tbk, which has an average of 11,371 sacks per shift, cannot meet the new bagging off target. This new bagging off target is given to anticipate the surge in feed demand. Efforts to increase production capacity need to be done to meet the new bagging off target. Calculation of standard time and simulation method is done in an effort to increase the capacity of bagging off. The average number of actual productions of the bagging off process shows that the bagging off process has reached 89.98% of the maximum capacity. The remaining 10.02% of maximum capacity lies in uncertain lost time. Proposed capacity improvements include improving lost time handling procedures, adding robotic arm machines, adding bagging off machine lines, and combining all proposals. Based on simulations, proposals that can help meet production targets are the addition of bagging off lines and a combination of all proposals. The proposed addition of bagging-off lines can increase bagging-off capacity to 33.1% and the proposed combination can increase bagging-off capacity to 40.16%.


Keywords


standart time; production capacity; simulation

Full Text:

PDF

References


Sutalaksana, I. Z., Anggawisastra, R., & Tjakraatmadja, J. H. Teknik Perancangan Sistem Kerja (2nd ed.). ITB, Bandung, 2006.

Purnomo, H. Pengantar Teknik Industri. Graha Ilmu, Yogyakarta, 2003.

Wignjosoebroto, S. Ergonomi, Studi Gerak, dan Waktu: Teknik Analisis untuk Peningkatan Produktivitas Kerja. Edisi pertama. Guna Widya, Surabaya, 2008.

Kumar, S. Production and Operation Management. New Age International Publisher, New Delhi, 2006.

Banks J, N. B. Discrete-event system simulation (4th ed.). NJ: Prentice Hall, Upper Saddle River, 2010.


Refbacks

  • There are currently no refbacks.