Abstract


This research is conducted to analyse about Total Productive Maintenance (TPM) at PT. X. PT. X itself is a construction company since 1994. This research focussed on the case study of crawler crane machines, especially service cranes owned by the company. PT. X said that the problem they face right now is sudden malfunction of the crawler crane that will certainly disrupt the pilling process. The company tries to increase the effectiveness of the machine by implementing TPM. The case study on the service crane will be analysed/calculated using Overall Equipment Effectiveness (OEE), which is one of the evaluation tools for TPM. OEE can show the productivity percentage of the crawler crane machine. The calculation of Six Big Losses also needs to be done to find out what losses have influenced the crawler crane effectiveness’ the most. This study provides recommendations using the 8 pillars of TPM aim to solve the most influential losses.


Keywords


total productive maintenance; overall equipment effectiveness; six big losses

Full Text:

PDF

References


Corder, A., Teknik Manajemen Pemeliharaan, Erlangga, Jakarta, 1992.

Nakajima, S., Introduction to TPM: Total Productive Maintenance, Productivity Press, Cambridge, 1988.

Ansori, N., dan Mustajib, M., Sistem Perawatan Terpadu, Graha Ilmu, Yogyakarta, 2013.

Stamatis, D., The OEE Premier: Understanding Overall Equipment Effectiveness, Reliability, and Maintainability, Taylor and Francis Group, New York, 2010.


Refbacks

  • There are currently no refbacks.