Perancangan Layout Ruang Sortir dan Analisis Kebutuhan Tenaga Kerja Perusahaan Logistik

Evania Evania(1*), Nova Sepadyati(2),


(1) Industrial Engineering Department, Petra Christian University
(2) Industrial Engineering Department, Petra Christian University
(*) Corresponding Author

Abstract


The research conducted in logistics company that provides door to door delivery services. This company is expanding the consolidator building where the goods handling process is carried out. Along with the expansion of the consolidator, company wants to design a sorting room layout that can minimize the occurrence of missroute goods and increase the effectiveness of the process at the consolidator. Company also wants to evaluate the needs of its operational and administrative workforce. The design of the consolidator layout is done by taking into account the number of destinations of the sorting room, the amount of aisle needed, and the amount of sorting space based on the volume of goods. The layout design produces 3 sorting areas with a total of 115 sorting rooms. Evaluation of workforce needs is done by work sampling and calculation of full time equivalent. The determination of operational workforce needs is then followed up with a process simulation with the help of standard time calculations. The result of the calculation is to reduce 3 workers who are projected to be able to reduce labor cost by IDR 100.811.501,- annually for the company.


Keywords


layout design; standard time; work sampling; full time equivalent

Full Text:

PDF

References


Heragu, S. S., Facilities Design, 3rd ed., Taylor and Francis Group LLC, United State of America, 2008.

Sule, D. R., Manufaturing Facilities: Location, Planning, and Design, 3rd ed., Taylor and Francis Group LLC, United State of America, 2008.

OSHA, OSHA fact sheet: Emergency Exit Routes, U.S. Department of Labor, USA, retrieved from https://www.osha.gov/OshDoc/data_General_Facts/emergency-exit-routes-factsheet.pdf on 10 June 2020.

Freivalds, A., & Niebel, B. W., Niebel’s Methods, Standards, and Work Design, 13th ed, McGraw-Hill, New York, 2014.

Dewi, U., & Satriya, A., Analisis Kebutuhan Tenaga Kerja Berdasarkan Beban Kerja Karyawan Pada PT PLN (Persero) Distribusi Jakarta Raya dan Tanggerang Bidang Sumber Daya Manusia dan Organisasi. Jurusan Manajemen SDM Fakultas Ekonomi Universitas, Jakarta, 2012.

Meyers, F. E., & Stewart, J. R., Motion and Time Study for Lean Manufacturing, 3rd ed., Pearson Education Inc, New Jersey, 2002.

Wignjosoebroto, S., Ergonomi, Studi Gerak dan Waktu, 4th ed., Guna Widya, Surabaya, 2006.


Refbacks

  • There are currently no refbacks.