PREDIKSI KINERJA WAKTU PROYEK KONSTRUKSI
(1) Magister Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Assaf, S.A. and Al-Hejji, S. (2006). “Causes of Delay in Large Construction Projects.” International Journal of Project Management. Vol. 24, 349-357.
+
Bacon, R.W. and Besant-Jones, J.E. (1998). “Estimating Construction Cost and Schedules.” Energy Policy. Vol. 26, No. 4, 317-333.
+
Clough, R.H. and Sears, G.A. (1994). Construction Contracting (6th ed.), John Wiley & Sons, Inc., New York.
+
Hair, J.F.,Jr., Anderson, R.E., Tatham, R.L. and Black, W.C. (1995). Multivariate Data Analysis with Readings (4th ed.), Prentice-Hall International, New Jersey.
+
Kaming, P.F., Olomolaiye, P.O, Holt, G.D. and Harris, F.C. (1997). “Factors Influencing Craftsmen’s Productivity in Indonesia.” International Journal of Project Management. Vol. 15, 21-30.
+
Ling, F.Y.Y., Swee, L.C., Chong, E., and Lee, P.E. (2004). “Predicting Performance of Design-Build and Design-Bid-Build Projects.” Journal of Construction Engineering and Management. Vol. 130, 75-83.
+
Van, T.L., Soo-Yong, K., Nguyen, V.T. & Ogunlana, S.O. (2009). “Quantifying Schedule Risk in Construction Projects Using Bayesian Belief Network.” International Journal of Project Management. Vol. 27, 39-50.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :