TINGKAT KEPENTINGAN RISIKO DAN RESPON RISIKO PADA TAHAP PELAKSANAAN PROYEK KONSTRUKSI
(1) Magister Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Project Management Institute (2013). A Guide to the Project Management Body of Knowledge PMBOK Guide, 3rd ed. PMI, Inc. Newtown Square, PA.
Aleshin, A. (2001). Risk Management of International Projects in Russia. International Journal of Project Management, 19(4), 207-222.
Committee, Australia/New Zealand Standard. (2004). AS/NZS 4360:2004 Risk Management, from www.riskmanagement.com.au/
El-Sayegh, S. (2008). Risk Management and Allocation in The UAE Construction Industry. International Journal of Project Management, 26(4), 431-438.
Flanagan, R. & Norman, G. (1993). Risk Management and Construction, Blackwell Scientific Publication. Oxford
Gunduz, M. Nielsen, Y., & Ozdemir, M., (2013). Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey, Journal of Management in Engineering, 29(2), 133-139.
Kartam, N., & Kartam, S. (2001). Risk and Its Management in The Kuwaiti Construction Industry: A Contractors’ Perspective. International Journal of Project Management, 19(6), 325-335.
Kloman, H.F. (1990), Risk Management Agonistes. Journal of Risk Analysis, 10 (2), 201-205.
Nesan, L. J., Price, A.D.F., (1997). Formulation of Best Practices for Owner's Representatives. Journal of Management in Engineering, 13(1). 44-51.
Proboyo, B. (1999), Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat dari Penyebab-Penyebabnya, Dimensi Teknik Sipil, 1(2), 1999
Zhi, H. (1995). Risk Management for Overseas Construction Projects. International Journal of Project Management, 13(4), 231-237.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :