PEMBUATAN SOFTWARE SEBAGAI APLIKASI LINEAR SCHEDULING METHOD PADA PERENCANAAN PENJADWALAN PROYEK JALAN
(1) Magister Teknik Sipil
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Agrama, F. A. E.-M. (2011). Linear Projects Scheduling using Spreadsheets Features. Alexandria Engineering Journal, 50(2), 179–185. http://doi.org/10.1016/j.aej.2011.01.018
Ammar, M. A. (2013). LOB and CPM Integrated Method for Scheduling Repetitive Projects. Journal of Construction Engineering and Management.
Arditi, D., Tokdemir, O. B., & Suh, K. (2002). Challenges in Line-of-Balance Scheduling. Journal of Construction Engineering and Management. http://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(545)
Hafez, S. M. (2004). Practical Limitations of Line-of-Balance in Scheduling Repetitive Construction Units. AEJ - Alexandria Engineering Journal, 43(5), 653–661. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-14644404875&partnerID=40&md5=5dbdf585113df5d4892d03f17533c98c
Hyari, K., & El-Rayes, K. (2006). Optimal Planning and Scheduling for Repetitive Construction Projects. Journal of Management in Engineering, 22(1), 11–19. http://doi.org/Doi 10.1061/(Asce)0742-597x(2006)22:1(11)
Iswanto, N. (2006). Sistem Penjadwalan LSM untuk Proyek Instalasi Pipa Bawah Tanah. Universitas Kristen Petra.
Shuh, J., Lin, Y.-H., Lin, Y.-C., & Wang, L.-C. (2013). Simplified CPM/LOB Methodology for Construction Project Management. Hokkaido University Collection of Scholarly and Academic Paper. Retrieved from http://hdl.handle.net/2115/54211
Zolfaghar Dolabi, H. R., Afshar, A., & Abbasnia, R. (2014). CPM/LOB Scheduling Method for Project Deadline Constraint Satisfaction. Automation in Construction, 48, 107–118. http://doi.org/10.1016/j.autcon.2014.09.003
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :