Studi Mengenai Directed Changes dan Constructive Changes pada Proyek Bangunan Tinggi di Surabaya
(1) Magister Teknik Sipil
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Akinsola, A. O., Potts, K. F., Ndekugri, I., and Harris, F. C. (1997). “Identification and Evaluation of Factors Influencing Variations on Building Projects”. International Journal of Project Management,15(4), 263–267.
Barrie, Donald S, and Paulson, Boyd C Jr. (1992). Professional Construction Management, third edition. Singapore, Mc Graw-Hill.
Douglas, Edward E. (2003). Effective Management of Project Change Order, third edition.
Fisk, Edward R, (1997). Construction Project Administration, fifth edition. Upper Saddle, New Jersey.
Fisk, Edward R, and Reynolds Wayne D. (2006). Construction Project Administration, eighth edition. Prentice Hall, New Jersey.
Hanna, Awad., Lotfallah, Wafik., and Lee, Min-Jae (2002). “Statiscal-Fuzzy Approach to Quantify Cumulative Impact of Change Order”. Journal of Construction Engineering and Management, ASCE, 116,253.
Levy, Sidney M (2002). Project Management in Construction, fourth edition. Mc Graw-Hill, New York.
Murni, Imam Mustika (2007). Faktor Penyebab, Akibat, dan Proses Pengolahan Change Order pada Proyek Rumah Tinggal di Surabaya. Program Pascasarjana Universitas Kristen Petra Surabaya.
Nunnally, S.W. (1993). Construction Methods and Management, third edition. Prentice Hall, New Jersey
Schaufelberger, John E. and Holm, Len. (2002). Management of Construction Project a Constructor’s Perspective. Prentice Hall,New Jersey.
Soeharto, Imam (1995). Manajemen Proyek dari Konseptual sampai Operasional. Airlangga, Jakarta.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :