PENGARUH PARAMETER BANGUNAN HIJAU GBCI TERHADAP FASE PROYEK

Edwin S. Wiyono(1*), Enry L. Dusia(2), Ratna S. Alifen(3), Jani Rahardjo(4),


(1) Mahasiswa Pascasarjana Magister Teknik Sipil UK Petra
(2) Mahasiswa Pascasarjana Magister Teknik Sipil UK Petrai
(3) Dosen Pascasarjana Magister Teknik Sipil UK Petra
(4) Dosen Pascasarjana Magister Teknik Sipil UK Petra
(*) Corresponding Author

Abstract


Green building concept has been widely developed globally as well as in Indonesia. Green Building Council Indonesia (GBCI) is the institution that organizes the green building certification in Indonesia. The view from construction parties is needed to understand the level of interest and level of implementation of green building parameters and the impact of green building parameters on project life cycle time.

This research carried out by distributing questionnaires to construction parties in Jakarta and Surabaya. Descriptive analysis and Structural Equation Modelling is used to understand the respondent views of the green building parameters and the impact of green building parameters on project life cycle time.

The results showed that the level of interest of green building parameters is high. The comparison between level of importance and level of implementation shows that the implementation rate is lower than the importance rate. Water conservation is a significant aspect affecting the project life cycle time specifically the design stage, while the other aspects haven’t been significantly affecting project life cycle time. 


Keywords


GBCI, green building, project life cycle time.

Full Text:

PDF

References


Barrie, Donald S. & Paulson, Boyd C. (1992). Professional Construction Management: Including C.M., Design-Construct, and General Contracting. McGraw-Hill Inc., New York

Choi, Christopher. (2009). Removing Market Barriers to Green Development: Principles and Action Projects to Promote Widespread Adoption of Green Development Practices. Journal of Sustainable Real Estate, 1, p.107-138.

Green Building Council Indonesia. (2012). Greenship untuk Gedung Baru. (1.1 ed.).Green Building Council Indonesia, Jakarta.

Project Management Institute. (2008). A Guide to the Project Management Body of Knowledge (4th ed.). Newton Square

Wiyono, Edwin Suryanata. (2013). Pengaruh Penerapan Greenship Rating Tools terhadap Waktu Pelaksanaan Konstruksi. Tesis.Fakultas Teknik Sipil dan Perencanaan. Universitas Kristen Petra, Surabaya.


Refbacks

  • There are currently no refbacks.


Jurnal telah terindeks oleh :