|
Issue |
Title |
|
Vol 7, No 2 (2018): AGUSTUS 2018 |
ANALISIS DAN APLIKASI ILMU TEKNIK SIPIL DALAM ADAPTASI PERUBAHAN IKLIM GLOBAL DI KAWASAN PESISIR PANTAI SIDOARJO PROVINSI JAWA TIMUR |
Abstract
PDF
|
Arvin Hartanto, Yusuf Chandra Purnomo, Surya Hermawan, Joko Purnomo |
|
Vol 11, No 2 (2022): September 2022 |
ANALISIS DIFFERING SITE CONDITIONS PADA PROYEK KONSTRUKSI DI SURABAYA |
Abstract
PDF
|
Yafet Setiawan, Jonathan Kurniawan, Andi Andi |
|
Vol 10, No 1 (2021): FEBRUARI 2021 |
ANALISIS DURASI PROYEK X DENGAN METODE EARNED SCHEDULE |
Abstract
PDF
|
Teddy - Sugiarto, Thomas Joshua Winarto, Sentosa - Limanto |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
ANALISIS EKONOMIS SEBAGAI DASAR PENGAMBILAN KEPUTUSAN DALAM PENGGANTIAN EXCAVATOR |
Abstract
PDF
|
Deviana Deviana, Tommy Christian Yuwono, Ratna S. Alifen |
|
Vol 12, No 1 (2023): MARET 2023 |
ANALISIS FAKTOR FAKTOR YANG BERPENGARUH PADA JADWAL REALISASI PADA PROYEK BENDUNGAN DI NGANJUK, SUMBAWA, DAN NTT |
Abstract
PDF
|
Bobby Christian Wijanarko, William Wibisana Luih, Paulus Nugraha |
|
Vol 5, No 1 (2016): FEBRUARI 2016 |
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PADA BANGUNAN TINGGI DI SURABAYA |
Abstract
PDF
|
Jordy Ladjao, Edwin Yurianto, Sentosa Limanto, Endro Wicaksono |
|
Vol 6, No 2 (2017): AGUSTUS 2017 |
ANALISIS FAKTOR PENYEBAB, USAHA MINIMALISASI DAN PROGRAM PERHITUNGAN SISA MATERIAL DINDING |
Abstract
PDF
|
Johannes Andrean Gunawan, Debi Christian, Ratna S. Alifen |
|
Vol 11, No 1 (2022): Februari 2022 |
ANALISIS FAKTOR YANG MEMPENGARUHI PRESTASI KERJA PADA STAF PERUSAHAAN KONTRAKTOR DI SURABAYA |
Abstract
PDF
|
Angelina Tjandra Santosa, Ailani Dewi Winarto, Herry Pintardi Chandra, Suhendro Ratnawidjaja |
|
Vol 8, No 2 (2019): AGUSTUS 2019 |
ANALISIS FAKTOR-FAKTOR KINERJA K3L SUBKONTRAKTOR PADA PROYEK-PROYEK DI SURABAYA |
Abstract
PDF
|
Hugo Marcellino, Michael Michael, Andi Andi |
|
Vol 11, No 1 (2022): Februari 2022 |
ANALISIS FAKTOR-FAKTOR YANG MEMENGARUHI PELANGGARAN ATURAN BATAS KECEPATAN PADA RUAS JALAN PERKOTAAN |
Abstract
PDF
|
Jeremy Putra Jaya, David Christ Fernaldy Chandra, Rudy Setiawan, David Wiyono |
|
Vol 11, No 1 (2022): Februari 2022 |
ANALISIS FAKTOR-FAKTOR YANG MEMENGARUHI PELANGGARAN LAMPU MERAH PADA PERSIMPANGAN JALAN PERKOTAAN |
Abstract
PDF
|
Yeremia Febrianto, Ricky Setiawan, Rudy Setiawan, David Wiyono |
|
Vol 11, No 2 (2022): September 2022 |
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI COST OVERRUN DAN PENGARUHNYA TERHADAP KEUANGAN PROYEK KONSTRUKSI DI SURABAYA |
Abstract
PDF
|
Gladys Jovita Sugiono, Julius Kevin Antonio, Suhendro Ratnawidjaja |
|
Vol 9, No 1 (2020): FEBRUARI 2020 |
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI KINERJA WAKTU PROYEK KONSTRUKSI PERUMAHAN DI SURABAYA DAN DI MADURA |
Abstract
PDF
|
Ancilla Maisie, Patrik Yohanes, Herry Pintardi Chandra, Soehendro Ratnawidjaja |
|
Vol 9, No 1 (2020): FEBRUARI 2020 |
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS PROYEK KONSTRUKSI |
Abstract
PDF
|
Vincentius - Lie, Ronny Gondo Hudaya, Ratna Setiawardani Alifen |
|
Vol 9, No 1 (2020): FEBRUARI 2020 |
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS PROYEK KONSTRUKSI |
Abstract
PDF
|
Vincentius - Lie, Ronny Gondo Hudaya, Ratna Setiawardani Alifen |
|
Vol 11, No 2 (2022): September 2022 |
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI TIME OVERRUN SERTA DAMPAKNYA TERHADAP PROJECT DELIVERY PADA PROYEK KONSTRUKSI DI SURABAYA |
Abstract
PDF
|
Gabriella Purwanto Puteri, Verrensia Lovenza, Suhendro Ratnawidjaja |
|
Vol 11, No 1 (2022): Februari 2022 |
ANALISIS FORECASTING DURASI PROYEK KONSTRUKSI DENGAN METODE EARNED SCHEDULE |
Abstract
PDF
|
Erick Tanoyo, Bagus Adinata Atmaja Sateng Wijaya, Andi Andi |
|
Vol 3, No 2 (2014) |
ANALISIS FREKUENSI, DAMPAK, DAN JENIS KETERLAMBATAN PADA PROYEK KONSTRUKSI |
Abstract
PDF
|
Theresia Monica Sudarsono, Olivia Christie, Andi , |
|
Vol 3, No 2 (2014) |
ANALISIS INVESTASI HUNIAN KOS DI DARMO PERMAI SELATAN |
Abstract
PDF
|
Nicko Vincent Yuwono, Herry Pintardi Chandra, Soehendro Ratnawidjaja |
|
Vol 10, No 2 (2021): AGUSTUS 2021 |
ANALISIS JADWAL PEKERJAAN PADA PROYEK KONSTRUKSI DENGAN METODE EARNED SCHEDULE |
Abstract
PDF
|
Reynold Rusman Paillin, Farin Davianna Layadi, Sentosa - Limanto |
|
Vol 9, No 2 (2020): AGUSTUS 2020 |
ANALISIS JADWAL PELAKSANAAN PROYEK GEDUNG BERTINGKAT X DI SURABAYA DENGAN METODE EARNED SCHEDULE |
Abstract
PDF
|
Aditya - Wijaya, Citra Yohanna Tjindra, Sentosa - Limanto |
|
Vol 8, No 2 (2019): AGUSTUS 2019 |
ANALISIS KEBUTUHAN AIR BERSIH KOTA MAKASSAR PADA TAHUN 2030 |
Abstract
PDF
|
Wira Wardhana Gunawan, Santoso Welerubun, Cilcia Kusumastuti, Prasetio Sudjarwo |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
ANALISIS KEPENTINGAN DAN PENERAPAN SISTEM MANAJEMEN KESEHATAN DAN KESELAMATAN KERJA (STUDI KASUS PROYEK GEDUNG P1 DAN P2 UKP) |
Abstract
PDF
|
Caesario Alam Widjaja S, Heryanto Hartadi, Ratna S. Alifen |
|
Vol 3, No 1 (2014) |
ANALISIS KEPUASAN PENGHUNI PERUMAHAN PONDOK TJANDRA INDAH |
Abstract
PDF
|
Jovita Caroline, Nelza Natally Harsony, Herry P. Chandra |
|
Vol 4, No 2 (2015): AGUSTUS 2015 |
ANALISIS KESIAPAN SUMBER DAYA MANUSIA PADA KONTRAKTOR DI SURABAYA MENGHADAPI MASYARAKAT EKONOMI ASEAN |
Abstract
PDF
|
Raynaldo Vea Winanda, Devin Ham, Paulus Nugraha |
|
51 - 75 of 648 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |