STUDI KASUS PENERAPAN 5 METODE ANALISA KETERLAMBATAN PADA SEBUAH PROYEK BANGUNAN BERTINGKAT DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(4) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Braimah, Nuhu. (2013). “Construction Delay Analysis Technique-Areview of Application Issue and Improvemeent Needs”. Civil Engineering Department, School of Engineering and Design, Brunel University, Uxbridge, 2013 : 506-531
Celeste, Brian. (2017). “The Use (or Misuse) of a Prospective Time Impact Analysis Provision in a Forensic Arena: a case study”. Navigant Consulting, Inc.
Hegazy, Saad. (2012). “Delay Analysis Methodology in UAE Construction Projects”. P.M. World Journal Vol. 1, Issue II September 2012.
Long, R.J. (2017). “As-Built But-For Delay Analysis”. Long International, Inc.
Nishimura, Sogen. (2017). “Studi Kasus Penerapan Metode Collapsed As-Built terhadap Sebuah Gedung Perkuliahan di Surabaya”. Petra Christian University, 5-6.
Proboyo, B. (1999). “Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat dari Penyebab-penyebabnya”. Dimensi Teknik Sipil Volume 1, No. 1 Maret 1999.