ANALISIS SISA MATERIAL KONSTRUKSI AKIBAT REWORK PADA PEKERJAAN FINISHING PROYEK RUMAH TINGGAL
(1) Mahasiswa Program Studi Teknik Sipil, Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil, Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil, Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Andi,et al (2005). “Faktor-Faktor Penyebab Rework pada Pekerjaan Konstruksi”. Civil Engineering Dimension, Vol 7, No. 1,22-29, March 2005. Universitasa Kristen Petra, Surabaya.
Carpenter, Thomas. (2001). The Environment, Construction and Sustainable Development. John Wiley and Sons Ltd, Chichester, United Kingdom.
Indonesia. Kementrian Pekerjaan Umum. (2013). Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum, Peraturan Menteri Pekerjaan Umum No. 11/PRT/M/2013. Author, Jakarta.
Love,PED,Mandal, P.,&Li,H. (1999). “Determining The Causal Structure of Rework Influences in Construction.” Construction Management and Economics, 17 (4):505-517.
Potts, T. (2004). “Triple Bottom Line Reporting – A Tool For Measuring, Communicating and Facilitating Change in Local Governments.” Effective Sustainability Education:Living Research and Practice 18-20 February, 2004, Sydney, Australia
Skoyles.E.R.(1976). Material Wastage : A missue of Resources. Watford, Garston.
The Instituion of Structural Engineers. (1999). Building for a Sustainable Future: Construction without Depletion. London.
The Instituion of Structural Engineers. (1999). Building for A Sustainable Future: Construction without Depletion. London.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :