STUDI KASUS PENERAPAN METODE COLLAPSED AS-BUILT TERHADAP SEBUAH BANGUNAN PERKULIAHAN DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(4) Dosen Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Alkass, S., Mazerolle, M., and Harris, F. (1996). “Construction Delay Analysis Techniques.” Journal of Construction Management and Economics. Vol. 14, 375–394.
Arditi, D., and Pattanakitchamroon, T. (2006). “Selecting a Delay Analysis Method in Resolving Construction Claims”, International Journal of Project Management, 24, 145-155.
Dayi, S. (2010). “Schedule Delay Analysis in Construction Projects: A Case Study Using Time Impact Analysis Method”, The Degree of Master of Science in Building Science Middle East Techinical University, Turkey.
Doyle, J. (2005). “Concurrent Delays in Contracts”. Doyles
Farrow, T. (2007). “Developments in the Analysis of Extensions of Time”, Journal of Professional Issues in Engineering Education and Practice, 133(3), 218-228.
Lee, H.-S., Ryu, H.-G., Yu, J.-H., and Kim, J.-J. (2005b). “Method for Calculating Schedule Delay Considering Lost Productivity”, Journal of Construction Engineering and Management, 131(11), 1147-1154.
Mbabazi, A., Hegazy, T., and Saccomanno, F. (2005). “Modified But-for Method for Delay Analysis”, Journal of Construction Engineering and Management, 131(10), 1142-1144. doi: 10.1061/(ASCE)0733-9364(2005)131:10(1142)
Ndekugri, I., Braimah, N., and Gameson, R. (2008). “Delay Analysis within Construction Contracting Organizations”, Journal of Construction Engineering and Management, 134(9), 692-700.
Tieder, J. B. (2008). “Methods of Delay Analysis and How They Are Viewed by the United States Legal System”, Society of Construction Law, Proceedings of International Construction Law Conference, London, England.
Trauner, T.J., Manginelli, W.A., Lowe, J.S., Nagata, M. F., and Furniss, B. J. (2009). “Construction Delays: Understanding Them Clearly, Analyzing Them Correctly”, Elsevier Inc, USA
Zack, J. G. (2000). “Pacing Delays – The Practical Effect”, Cost Engineering, 42(7), 23 – 28.