STUDI KASUS PENERAPAN SCHEDULE ASSESSMENT PADA PENJADWALAN PROYEK SALAH SATU GEDUNG BERTINGKAT DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra Surabaya
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Bogle, B. (2016). “DCMA 14-Point Assessment for Project Schedule Health.” Edwards Performance Solutions, 1-4.
Deltek. (2016). “Create The Soundest Schedules Possible and Execute Them with Consistent Success.” Deltek Acumen Fuse, 1-4. Makar, A. (2014). “Project Schedule Quality 101: 14 Ways to Improve Your Project Schedule.” Project Schedule. Retrieved February 9, 2017, from http://www.tacticalprojectmanagement.com/project-schedule-quality-101/ Persons, T.M. (2015). Schedule Assessment Guide: Best Practices for Project Schedules. GAO-16-89G. Washington, D.C.
Proboyo, B. (1999). “Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat dari Penyebab-Penyebabnya.” Dimensi Teknik Sipil. Vol. 1, No. 1.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :