MONITORING JADWAL SUATU PROYEK SEKOLAH DENGAN MENGGUNAKAN METODE SPI DAN PPC
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Hamilton, Albert (1997). Management by Project. Thomas Telford Services Ltd, London.
Kaming P.F. et al., (1997). Factors Influencing Construction Time and Cost Overruns On High Rise Project in Indonesia, Construction Management and Economics, 15(2), 11-13.
Moungnoi W. dan Charoenngam C. (2001). Operational Factors Influencing Highrise Building Construction Delay in Thailand. Proceeding of Third International Conference on Construction Project Management, Singapore.
Olomolaiye, P.O., Wajan, L.A., amd Price, A.D.F, (1987). Problem Influencing Craftmen’s Productivity in Nigeria, Building and Environment 2(2), 5-7.
Soemardi, Biemo W. (2007). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi. Institut Teknologi Bandung, Bandung.
Stretton A. dan Stevens G. (1990). PREDICTE: An Expert System for Estimating Indicative Construction Times for Multi Storey Buildings at the concept stages, Proceedings of the CIB 90 International Symposium on Building Economics and Construction Management, Sydney, March, 2(2), 8-10.