UPAYA PENERAPAN SOURCE VALIDATION PROTOCOL DARI FORENSIC SCHEDULE ANALYSIS PADA SALAH SATU PROYEK GEDUNG BERTINGKAT DI SURABAYA
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Hoshino, K. P., at al. (2011). Forensic Schedule Analysis (rev. edition). AACE® International.
Braimah, N. (2013). Construction Delay Analysis Techniques: A Review of Application Issues and Improvement Needs. Civil Engineering Department, School of Engineering and
Design, Brunel University, 506 – 531.
Onoforio, D. F. M. dan Hoshino, K. P. (2010). AACE Recommended Practice for Forensic Schedule Analysis. American Bar Association Forum on the Construction Industry:
April 22.
Kartam, S. (199) Generic Methodology for Analysing Delay Claims. Construction. Engineering. Management. ASCE ,125, 409–419.
Wickwire, J.M. (2004) Groff, M.J. Update on CPM proof of delay claims. Sched. Update-Project Manag. Instit. Coll. Sched. , 1, 3–9.
Peters, T.F. (2007) Performing Forensic Delay Analyses from Deep within the Black Tent. AACE Int. Trans. 2, CDR.01.1–CDR.01.9.
Alkass, S.; Mazerolle, M.; Harris, F. (1996) Construction Delay Analysis Techniques. Construction Management Economic. 14, 375–394.
Ibbs, W.; Nguyen, L.D. (2007) Schedule Analysis under the Effect of Resource Allocation. Construction. Engineering. Management ASCE 2007, 133, 131–138.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :