ANALISIS JADWAL PEKERJAAN PADA PROYEK KONSTRUKSI DENGAN METODE EARNED SCHEDULE
(1) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(2) Mahasiswa Program Studi Teknik Sipil Universitas Kristen Petra
(3) Dosen Program Studi Teknik Sipil Universitas Kristen Petra
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDFReferences
Lipke, W., Zwikael, O., Henderson, K., dan Anbari, F. (2009). “Prediction of Project Outcome: The Application of Statistical Method to Earned Value Management and Earned Schedule Performance Indexes.” International Journal of Project Management, 27(4), 400-407.
Lipke, W. (2014). “Introduction to Earned Schedule.” PM World Journal, 3(11).
Proboyo, B. (1999). “Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat dari Penyebab-Penyebabnya.” Civil Engineering Dimension, 1, 49-50.
Vanhoucke, M., Vandevoorde, S. (2007). “A Simulation and Evaluation of Earned Value Metrics to Forecast the Project Duration.” Journal of the Operational Research Society, 58(10), 1361-1374.
Vanhoucke, M., Andrade, P., Salvaterra, F., dan Batselier, J. (2015). “Introduction to Earned Duration.” The Measurable News, (2), 15.
Refbacks
- There are currently no refbacks.
Jurnal telah terindeks oleh :